Original source · versioned page text
MCU -Cooroy
Noosa Council documents MCU15/0111 86. A Traffic Management Plan for the each separate demolition and construction phase of the development shall be submitted to and approved by Council at least 5 working days prior to the commencement of any Demolition or Building works or at least 5 working days prior to the pre-start meeting for Operational Works. The Traffic Management Plan shall include but not be limited to: 86.1. Mitigate any adverse impact and disturbance on the local residential area and on the traffic in the local and main roads to acceptable limits 86.2. Mitigate dust disturbance caused by vehicles and machinery movements 86.3. Limit the routes for the heavy vehicles to the major road network and limit the use of the local roads within residential area as access to the site 86.4. Indicate provision for on-site and off-site parking for the required workforce 86.5. Indicate the location of loading and unloading areas 86.6. Indicate the location of any “holding” areas for heavy vehicles 86.7. Operating hours. Note - the Elm Street frontage of site shall not be used for access, parking or loading and unloading during construction (and post construction) phase unless a specific written permit obtained from the Department of Main Roads. 87. Any damage caused to any public utility during the course of construction shall be repaired to Council’s standards and at no cost to Council. 88. Any alteration of any public utility or other facilities necessitated by the development of the land or associated construction works external to the site shall be at no cost to Council. 89. The transportation of all materials to and from the site shall be undertaken in a manner such that no particle matter escapes onto a public road. All vehicles carrying materials either to or from the site shall be covered to prevent materials including dust being windblown from the vehicle. 90. As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer for design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all services and structures. All of which shall be submitted to Council for checking and for Council's records. The data must fully detail levels for all engineering works including but not limited to roadworks, pathway, sewer main, water supply main, finished ground levels and pavement surface levels and drainage structures that will become Council asset. The data shall be submitted in the Asset Design and As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at www.adac.com.au). Approval of works shall not be granted until all As Constructed information has been supplied and accepted by Council. Waste Management 91. A Waste Management Plan (construction and demolition) shall be submitted prior to demolition, removal or relocation of any building other than a shed. Waste Management Plan (construction and demolition) is also required for construction of 15 or more dwelling units or for any business use of greater than 500m?. Page 13 of 37 Document Set ID: 20103451 Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU -Cooroy.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.