MCU15/0111

15. On completion of the development, the developer must submit to Council written
certification from an Acoustic Engineer confirming the proposed noise barriers
meet the noise limits for each adjoining residence as outlined in the approved
Acoustic Report.

Fencing

16. Fencing shall be erected to all boundaries of the site and shall have a minimum
height of 1.5 metres Trading Post Road and Pearsons Road and 1.8 metres on all
other boundaries (Note: fences may be required to have a greater height for the
purpose of meeting acoustic requirements, as further detailed in these conditions).

17. All fencing to road frontages of the site shall be setback a minimum of 1 metre with
an average of 2 metres and be screened with landscaping, or alternatively, be of
open construction (ie. minimum 50% transparent) (provided it is not a required
acoustic fence).

18. Any new fencing along the northern boundaries of existing Lot 4 RP 215922
adjoining Prospect Park (Lot 101 SP 208264) must be flood compatible e.g. three
strand plain wire fencing.

Building Setbacks

19. All buildings shall be setback a minimum of 6 metres to Elm Street, Pearsons
Road, Lamonts Road and Trading Post Road, with the exception of the northern
corner of the aged care facility shown at 5.5m from Trading Post Lane.

20. All buildings shall be setback a minimum distance of 2 metres to adjoining
properties.

Built Form

21. Buildings shall be varied in their architectural style, construction materials, colours
and finishes.

22. Transformers, waste storage areas and the like shall be screened to reduce their
visual intrusiveness.

External Road/Frontage Works on Main Roads

23. Roadworks required on Cooroy Connection Road (Elm Street) at its intersection
with Pearsons Road including two Bus Stops with shelters, a pedestrian refuge
and upgrade to existing kerb line and linemarking must be undertaken in Stage 1a
of development in accordance with a Development Permit for Operational Works.
The works shall be generally as shown on drawing titled External Works Functional
Layout Plan Pearsons Road Intersection, prepared by Calibre Consulting dated
08/01/2016, referenced 15-001261-RF02 Issue B and in compliance with
Department of Transport and Main Roads (DTMR) standards, and subject to
Council's and DTMR’s approvals.

24. Roadworks required on Cooroy Connection Road (Elm Street) at its intersection
with Lamonts Road must be undertaken in Stage 4 in accordance with a
Development Permit for Operational Works of development. The works shall be
generally as shown on drawing titled External Works Functional Layout Plan
Lamonts Road Intersection, prepared by Calibre Consulting dated 08/01/2016,
referenced 15-001261-RF01 Issue B and in compliance with Department of
Transport and Main Roads standards, and subject to Council's and DTMR's
approvals.

Page 5 of 37

Document Set ID: 20103451
Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM

Log in to download the original (MCU -Cooroy.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.