Original source · versioned page text
MCU -Cooroy
Noosa Council documents MCU15/0111 25. A 2m wide path on Elm Street shall be constructed from the pedestrian access point that fronts Elm Street (Gatehouse). The path shall be in accordance with Council's design standards and to an alignment that protects any significant vegetation and above and underground services. The works shall be included in Stage 1a and be in accordance with a Development Permit for Operational Works. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. Bus Stops 26. The applicant shall design and construct a bus stop and shelter on Elm Street to the frontage of Lot 135 MCH 978 (north of 156 Elm Street) at approximately 70m south of the center line of Pearson Road intersection (or an alternative location as may be required by TransLink or DTMR). The works shall be included in Stage 1a and be in accordance with a Development Permit for Operational Works. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. 27. The applicant shall design and construct a bus stop and shelter on western side of Elm Street to be located generally opposite the other required new bus stop on the eastern side of Elm Street. The works shall be included in Stage 1a and be in accordance with a Development Permit for Operational Works. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. 28. The proposed bus stops are to be “Indented” and be in accordance with the current TransLink Public Transport Infrastructure Manual. The bus stop must contain all Mandatory and Preferred components as stated in the manual for ‘intermediate stop’, and be constructed in accordance with the new Noosa Council Custom Design Rural Bus Shelter. 29. A pedestrian refuge island must be constructed on Elm Road in Stage 1a to provide pedestrian access connection to the new bus stop shelter on the western side of Elm Street. The works shall also include any necessary pathway on western side Elm Street to provide the required connection. This refuge island must be included in the design and the construction of the intersection of Pearsons Road with Elm Street and must include all the mandatory requirement (e.g. lighting) in compliance with the relevant standards. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. External Road/Frontage Works to Council Roads 30. The applicant must design and construct kerb and channelling along the western side of Pearsons Road with any associated road widening and drainage works to achieve Local Road standard for urban area (8m Kerb to Kerb) in accordance with Council's Planning Scheme Policy 5 - Engineering Design Standards — Roads, Drainage and Earthworks. The works shall be included in Stage 1a and be in accordance with a Development Permit for Operational Works. This condition is imposed pursuant to s665 of the Sustainable Planning Act 2009 being non-trunk infrastructure. Page 6 of 37 Document Set ID: 20103451 Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU -Cooroy.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.