Original source · versioned page text
MCU -Cooroy
Noosa Council documents MCU15/0111 Earthworks 53. All earthworks must be carried out in accordance with a Geotechnical Report (or part thereof) prepared by a qualified person* and endorsed through a Development Permit for Operational Works approval. *(Refer to Advisory Note) 54. All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines on Earthworks for Commercial and Residential Development, with geotechnical testing undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and uniformity of fill shall be provided by a RPEQ and submitted to Council prior to final inspection/s of works. 55. A registered practicing Geotechnical Engineer shall test the existing ground conditions for suitability of placing additional fill, prior to such fill being placed. 56. Filling works shall be restricted to the subject site itself, and the finished fill levels are to taper to the existing levels on the property. Batters shall be at a maximum grade of 1:4 unless retained by an engineer-designed wall or approved retention method. 57. Any fill imported to the site may only be from a site licensed with The Environmental Protection Agency or from a site for which a Development Permit for Operational Works has been issued approving the export of fill. 58. Following completion of the filling works for each Stage, the registered practicing Geotechnical Engineer supervising the works shall submit compaction tests across the entire filled areas and make recommendations if special foundations requirements will apply. 59. Buildings floor levels and bulk earthworks finish levels must take into consideration any building Minimum Floor Level required by the planning scheme at the time of construction. 60. Earthworks carried out on site must not adversely affect the drainage conditions on any other properties or existing roads, and/or the patterns and severity of flooding in the area particularly on downstream properties. Filling works required on site shall not cause additional ponding of water on any adjoining lands or the blockage of, or interference with, any natural watercourses. Detailed site surveys indicating natural surface levels and contours of any potentially affected properties must be provided with any application for a Development Permit for Operational Works for earthworks and/or stormwater drainage works. This may require the design and construction of drainage pipes and/or an overland flow-path within the development site to cater for drainage from the adjoining sites for a 1% AEP design storm. Stormwater Drainage (Quantity & Quality) 61. A suitably qualified Registered Professional Engineer, specialising in hydraulics shall prepare engineering drawings and specifications for stormwater designs and shall be submitted in conjunction with an application for a Development Permit for Operational Works. 62. Stormwater pipelines within the site shall cater for 10% AEP storm event and secondary flow paths shall be provided within the site to cater for 1% AEP storm event. Page 9 of 37 Document Set ID: 20103451 Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU -Cooroy.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.