Original source · versioned page text
MCU -Cooroy
Noosa Council documents MCU15/0111 63. The development must not adversely impact on the existing drainage conditions on other properties. The applicant must demonstrate that all stormwater runoffs from the fully developed site must be maintained at predevelopment rates for all storm events up and including 1% AEP storm event. 64. Stormwater runoff generated from the development must be treated to achieve the Water Quality Objectives as specified under Healthy Waterways Water Sensitive Urban Design — Technical Guidelines for South East Queensland (2006) as well as the State Planning Policy 2014 (SPP 2014) prior to release off site. For the purpose of this condition, treatment of waters from catchments B1 and C1 as shown on Drawing B14158.W-SK100 A by Calbre Consulting, dated 050/2/16 shall be considered as part of the development to determine mitigation requirements and load reduction targets. If detailed design demonstrates insufficient footprint is available for the water quality treatment devices to achieve the pollutant reduction targets of 80% reduction in Total Suspended Solids, 60% reduction in Total Phosphorous, and 45% reduction in Total Nitrogen compared to an unmitigated development, the applicant must increase available space to ensure the water quality objectives can be achieved. 65. Stormwater Quality Treatment must be designed in accordance with the Water by Design MUSIC modelling Guidelines. Any deviation away from the recommendations of the Water by Design guidelines may only be approved where: 65.1. letters signed by the authors of the Water by Design MUSIC modelling guidelines and/or eWater MUSIC modelling program are provided to confirm that the modelled design is expected to meet the required water quality outcomes at the discharge point of the site; and 65.2. a contingency plan to monitor for and to remove cyanobacterial and algal outbreaks from waterbodies, including costs, is provided for approval with the Operational Works application and the approved version is implemented throughout the lifetime of the development. All stormwater runoff treatment must be undertaken within the development areas of the site. Stormwater likely to contain grease and oil (i.e. from all roads and car parking areas) shall be managed via grease and oil arrestors prior to treatment within bioretention basins, wetlands and water quality control ponds. 66. Wetlands, bioretention basins and other water quality treatment devices shall be designed and constructed in accordance with Healthy Waterways Water Sensitive Urban Design — Technical Guidelines for South East Queensland 2006, Water by Design Bioretention Technical Design Guidelines 2014, Healthy Waterways Water by Design Construction and Establishment Guidelines: Swales, Bioretention Systems and Wetlands February 2009. In the case of any inconsistencies between these documents, the most recent document shall prevail. 67. Stormwater treatment strategy must be designed and maintained to achieve compliance with the approved version of B14158.W.07L.AMcP.ag.docx dated 8 October for the Stormwater Management Construction and Maintenance Plan Framework. 68. The detailed Stormwater Management Construction and Maintenance Plan (SMCMP) must be designed and implemented in accordance with the framework detailed in the approved version of B14158.W.07L.AMcP.ag.docx dated 8 October and approved by the Council prior to issue of operational works approval: Page 10 of 37 Document Set ID: 20103451 Version: 1, Version Date: 25/07/2016 Print Date: 25 July 2016, 3:34 PM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU -Cooroy.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.