Attachment B - Construction Methodology KANE

of 19

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                     HOFFMAN DRIVE MEDICAL CENTRE
                                                                                    BASEMENT AND RETENTION WORKS



5.          WORKPLACE HEALTH & SAFETY
Kane has a comprehensive Occupational Health and Safety Management System that complies with the
requirements of, and is certified in accordance with AS/NZS 4801:2001 & the NSW OH&S Management System
Guidelines June 2004 (which is generally considered a more onerous standard than AS/NZS 4801:2001).

Kane was also one of the first builders in Australia to be certified by the Federal Safety Commission. To maintain
FSC certification, Kane are subject to a series of reaccreditation audits on an annual basis which provides our
employees and clients with the confidence that our systems are implemented on all Kane projects.

Our Occupation Health and Safety Management System on-site is commonly called ‘The Red Book’ Our Red
Book is the backbone behind the safe delivery of our projects. Implementation of our Red Book starts on award
where responsibilities are defined by our project team and sub-contractors are made aware of their obligations to
provide site specific hazard identification, risk assessment and controls associated with each trade package
(SWMS).


5.1         PROJECT SPECIFIC WH&S RISK ITEMS
Key project specific risks have been identified below. Project planning and final safety plans will address all of
these key areas.

 TRADE RISKS

 RISK IDENTIFIED             CONTROL MEASURE

 Rock during                 Although this does not seem to be a potential issue according to the geotechnical
 groundworks                 report, if rock is present our local civil works contractor will be able to deliver the
                             appropriate equipment to mitigate time loss using conventional equipment.

 Undocumented services       Prior to commencement Kane will undertake all required dial before you dig and
 during groundworks          associated investigations to ensure that all known services and located and
                             addressed.

                             In the event that any undocumented service is encountered, works will cease until
                             such a time that a plan to divert/remove those services is developed and signed off
                             by the relevant authorities.

 Suitability and safety of   All Plant and Equipment to be used during the works will be Inspected and signed
 all Plant and Equipment     off in accordance with Kane’s OH&S system. This system ensures, at a minimum,
 to be used onsite           that;
                                  - The equipment is appropriate for the proposed task
                                  - All safety controls are install and functional
                                  - All schedule maintenance is completed
                                  - Plant operators are appropriately ticketed and experienced.

 Traffic movement            Traffic movement will be managed in accordance with the approved Traffic
                             Management plan.


 Pedestrian movement         Pedestrian movement will be managed in accordance with the approved Traffic
                             Management plan.

                             At all times, Pedestrian Movement and access is to be separated from Traffic
                             movement.




WORKPLACE HEALTH & SAFETY                                                                               PAGE 10 OF 13
Log in to download the original file

Attachment B - Construction Methodology KANE.pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.