Original source · versioned page text
Attachment B - Construction Methodology KANE
HOFFMAN DRIVE MEDICAL CENTRE
BASEMENT AND RETENTION WORKS
Falls during retention Appropriate edge protection and exclusion zones will be established at all times
excavation. during basement excavation.
Site fencing will be maintained via daily inspections to ensure that no
unauthorised, out of hours’ access is possible onsite.
WORKPLACE HEALTH & SAFETY PAGE 11 OF 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.