22 September 2023
M3024E-001
Chief Executive Officer
Noosa Council
PO Box 141
Tewantin QLD 4565
Attn: Tara Norley
Re: Cambooya Pty Ltd
36 & 38 Duke Street, Sunshine Beach
Council Application No. MCU23/0070
Dear Sir/Madam,
Reference is made to our Application for an MCU associated with the above noted development.
We acknowledge receipt of Council’s information request dated 14 June 2023 and provide additional engineering
information requested as follows:
JFP Information Response to Items 13 – 15
Issue – Stormwater Drainage
The submitted documentation does not include sufficient information for Council to assess how stormwater generated
by the development will be controlled, collected, and discharged.
• It is unclear what the proposed structure downstream from the proposed detention tank is and how it will
integrate into the proposed drainage system (indicated by a blue circle).
Response: The ‘blue circle’ is a manhole/roofwater pit. It conceptually shows a junction at which drainage
pipes change direction. The concept plans have been amended in Revision B of the SBSMP and further details
can be provided during detailed design as required.
• It is unclear how the proposed detention tank overflows during events up to, and including, a 1% AEP event
(volume, discharge rate).
Response: The outflow from the tank is controlled via a 75mm diameter orifice. It limits 1% AEP site discharge
to 25L/s as requested in dot point #5. An overflow weir is proposed at RL 33.11m AHD to allow overflow. Refer
additional information detailed in Revision B of the SBSMP.
• It is unclear how the infiltration outlet of the detention tank will operate. Given the large catchment area of the
detention tank, Council is concerned the soil may become oversaturated and the filtration rate of the soil will
reduce which may adversely affect the overall drainage system and the structural elements of the
development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
Response: No infiltration is proposed. All outflows are directed to Duke Street kerb and channel. Refer
additional information detailed in Revision B of the SBSMP.
• It is unclear how the proposed field inlet in catchment D3 will function during a 1% AEP event. Council recognise
that this field inlet serves both the overflow from the detention tank and a small catchment area. Council is
concerned that during events up to, and including, a 1% AEP event this pit may surcharge and direct additional
runoff on to the footpath in the road reserve.
Response: Runoff from a majority of Catchment D3 will be collected by building’s roofwater system. The
proposed field inlet in Catchment D3 has been amended to a roofwater pit and it can be provided with a bolt
down cover so that it will not surcharge. The outflow pipe from the detention tank will operate under head.
This is consistent with standard building hydraulic design. Refer additional information detailed in Revision B
of the SBSMP.
• The discharge rate of the RHS kerb adapter is unclear. Council is unlikely to support a discharge rate higher than
25 l/s during a 1% AEP event.
Response: The discharge rate from site has been limited to 25L/s in a 1% AEP storm event. This has been
achieved by increasing detention volume and limiting outflows via 75mm diameter orifice. Appropriate screens
can be incorporated in detail design to minimise blockage of this orifice. Any additional requirements can be
conditioned. Refer additional information detailed in Revision B of the SBSMP.
Information Required
13. Provide additional detail to address Council’s concerns. The additional detail must be prepared by a suitably
qualified person (RPEQ).
Note that the detail can be preliminary in nature but must be sufficiently detailed to demonstrate that the
stormwater system is conceptually functional.
Response: Refer amended Site Based Stormwater Management Plan (Revision B) prepared by a suitably qualified
RPEQ attached to this response.
Issue – Driveway Access
The submitted documentation does not contain sufficient information for Council to assess the proposed driveway.
Information Required
14. Provide additional detail on the proposed driveway and crossover. The detail must be prepared by a suitably
qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but not be limited to:
a. dimensions, levels and grade of the access driveway; and
Response: Refer attached sketch drawing M3024E R01 A detailing levels and grade of the access driveway. A
longitudinal section located 1m off the western side of the driveway has been chosen as the “worst case grade
scenario”.
b. demonstrate that a B99 vehicle will not scrape or bottom out while entering or exiting the driveway.
Response: Refer attached sketch drawing M3024E R01 A demonstrating that a B99 vehicle will not scrape
or bottom while entering or exiting the access driveway. A longitudinal section located 1m off the western
side of the driveway has been chosen as the “worst case grade scenario” and provides clearance of
approximately 20mm for a B99 vehicle.
JFP Ref: M3024E-001 Page 2
Page 3
Issue – Earthworks
An earthworks plan has not been provided and therefore it is unclear the extent of earthworks required to be carried
out for the proposed development.
Information Required
15. Provide an Earthworks Plan demonstrating the extent of the proposed earthworks required to carry out the
proposed works. The additional plan must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland) and include, but not be limited to:
a. the extent and volume of cut and fill; and
Response: Refer attached sketch drawing M3024E EW01 A detailing extent and volume of cut and fill.
Approximate volume of cut of 497m3 and approximate volume of fill of 1m3 (based on a slab thickness of
200mm).
b. demonstrate the proposed earthworks will not adversely affect any structures within the adjoining
properties; and
Response: Refer Core Consulting advice attached to JFP information response. The Core Consulting advice
provides generic guidelines on temporary batter slopes, drainage & erosion control and QBCC Guide to
Preventing Structural Damage to be adopted during the building design and construction phase of the
development to ensure proposed earthworks do not adversely affect adjoining structures. Actual proposed
measures to ensure earthworks do not adversely affect adjoining structures will be prepared and submitted
to Council as part of the Building Application design and construct process by the appointed building
contractor.
c. demonstrate that all retaining structures, both temporary and permanent, both above and below ground, will
be contained entirely within the subject site.
Response: Refer Core Consulting advice attached to JFP information response. The Core Consulting advice
provides generic guidelines on footing and retaining wall design to be adopted during the building design
and construction phase of the development. Actual retaining wall design, both temporary and permanent,
above and below ground, contained entirely within the site will be prepared and submitted to Council as
part of the Building Application design and construct process by the appointed building contractor.
Please contact the undersigned if you wish to discuss any issues pertaining to this response.
Yours faithfully,
ANDREW FRASER
SENIOR ENGINEER (RPEQ 5691)
JFP URBAN CONSULTANTS
Encls: Amended Site Based Stormwater Management Plan (Revision B)
JFP Ref: M3024E-001 Page 3
Page 4
JFP Sketch Drawings M3024E R01 A & M3024E EW01 A cc: David Dunworth – Cambooya Pty Ltd JFP Ref: M3024E-001 Page 4
Page 5
33.80
n
Bi
SW
33.95
RPEQ DESIGNED SHORING SYSTEM TO BE
OBTAINED PRIOR TO COMMENCEMENT OF
WORKS ON SITE.
CONTRACTOR TO ENSURE EXCAVATION
FACE ADJACENT TO BOUNDARY IS IN A
STABLE STATE AT ALL TIMES DURING
CONSTRUCTION. ·
·
CONTRACTOR TO ENSURE NO DAMAGE
OCCURS TO ADJOINING PROPERTY ·
DURING WORKS.
22/09/2023 N:\M3024\DESIGN\WORKING DRAWINGS\EARTHWORKS
NORTH: SCALE: ISSUE: TITLE: DETAILS:
PROJECT: PLAN: ISSUE:
1:100 THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE
BRISBANE - SUNSHINE COAST - CENTRAL QLD PLANNERS 0 1 2 3 4 5 (A1) 1:100 10 EARTHWORKS LAYOUT PLAN M3024E EW01 A
A1
N
Metres
URBAN DESIGNERS (A3) 1:200 LOCAL AUTHORITY REF:
SUNSHINE COAST
237-239 Bradman Avenue, SURVEYORS DO NOT SCALE FROM THIS DRAWING - USE ONLY DIMENSIONS PROVIDED - IF IN DOUBT PLEASE ENQUIRE
NOOSA COUNCIL
Maroochydore Qld 4558 DESIGNED AF CAMBOOYA PTY LTD COUNCIL REF:
ENGINEERS APPROVED T.MCKINNEY A.FRASER J.PAPPAS
P 07 5450 3900 W www.jfp.com.au
C O N S U L T A N T S JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045 LANDSCAPE ARCHITECTS __________________________________
RPEQ 5087
S.MARSH
RPEQ 5691 RPEQ 6086 DRAWN
CHECKED
DJG
AF A ORIGINAL ISSUE FOR COUNCIL 22/09/23 DJG
PROPOSED DEVELOPMENT AT MCU23/0070
FOR AND ON BEHALF OF JFP URBAN CONSULTANTS PTY LTD
RPEQ 8068 DATUM: AHD ISSUE: DETAILS: DATE: INIT: 36 & 38 DUKE STREET, SUNSHINE BEACH FILE NAME: EARTHWORKS.DWG
COPYRIGHT © 2011 JFP URBAN CONSULTANTS PTY LTD THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
Page 6
n
Bi
33.95
22/09/2023 N:\M3024\DESIGN\WORKING DRAWINGS\ROADWORKS
NORTH: SCALE: ISSUE: TITLE: DETAILS:
PROJECT: PLAN: ISSUE:
1:100 THIS SCALE SHOWN IS ORIGINAL DRAWING SCALE
BRISBANE - SUNSHINE COAST - CENTRAL QLD PLANNERS 0 1 2 3 4 5 (A1) 1:100 10 CARPARK DETAIL PLAN M3024E R01 A
A1
N
Metres
URBAN DESIGNERS (A3) 1:200 LOCAL AUTHORITY REF:
SUNSHINE COAST
237-239 Bradman Avenue, SURVEYORS DO NOT SCALE FROM THIS DRAWING - USE ONLY DIMENSIONS PROVIDED - IF IN DOUBT PLEASE ENQUIRE
NOOSA COUNCIL
Maroochydore Qld 4558 DESIGNED AF CAMBOOYA PTY LTD COUNCIL REF:
ENGINEERS APPROVED T.MCKINNEY A.FRASER J.PAPPAS
P 07 5450 3900 W www.jfp.com.au
C O N S U L T A N T S JFP URBAN CONSULTANTS PTY. LTD. A.C.N. 050 414 045 LANDSCAPE ARCHITECTS __________________________________
RPEQ 5087
S.MARSH
RPEQ 5691 RPEQ 6086 DRAWN
CHECKED
DJG
AF A ORIGINAL ISSUE FOR COUNCIL 22/09/23 DJG
PROPOSED DEVELOPMENT AT MCU23/0070
FOR AND ON BEHALF OF JFP URBAN CONSULTANTS PTY LTD
RPEQ 8068 DATUM: AHD ISSUE: DETAILS: DATE: INIT: 36 & 38 DUKE STREET, SUNSHINE BEACH FILE NAME: ROADWORKS.DWG
COPYRIGHT © 2011 JFP URBAN CONSULTANTS PTY LTD THIS DOCUMENT MAY NOT BE COPIED OR TRANSMITTED IN ANY FORM OR BY ANY MEANS IN PART OR IN WHOLE WITHOUT THE WRITTEN CONSENT OF JFP URBAN CONSULTANTS PTY LTD.
Used in these records
Attachment E_Engineering_Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.