Attachment E_Engineering_Response · MCU23/0070
Response: No infiltration is proposed. All outflows are directed to Duke Street kerb and channel. Refer
additional information detailed in Revision B of the SBSMP.
• It is unclear how the proposed field inlet in catchment D3 will function during a 1% AEP event. Council recognise
that this field inlet serves both the overflow from the detention tank and a small catchment area. Council is
concerned that during events up to, and including, a 1% AEP event this pit may surcharge and direct additional
runoff on to the footpath in the road reserve.
Response: Runoff from a majority of Catchment D3 will be collected by building’s roofwater system. The
proposed field inlet in Catchment D3 has been amended to a roofwater pit and it can be provided with a bolt
down cover so that it will not surcharge. The outflow pipe from the detention tank will operate under head.
This is consistent with standard building hydraulic design. Refer additional information detailed in Revision B
of the SBSMP.
• The discharge rate of the RHS kerb adapter is unclear. Council is unlikely to support a discharge rate higher than
25 l/s during a 1% AEP event.
Response: The discharge rate from site has been limited to 25L/s in a 1% AEP storm event. This has been
achieved by increasing detention volume and limiting outflows via 75mm diameter orifice. Appropriate screens
can be incorporated in detail design to minimise blockage of this orifice. Any additional requirements can be
conditioned. Refer additional information detailed in Revision B of the SBSMP.
Information Required
13. Provide additional detail to address Council’s concerns. The additional detail must be prepared by a suitably
qualified person (RPEQ).
Note that the detail can be preliminary in nature but must be sufficiently detailed to demonstrate that the
stormwater system is conceptually functional.
Response: Refer amended Site Based Stormwater Management Plan (Revision B) prepared by a suitably qualified
RPEQ attached to this response.
Issue – Driveway Access
The submitted documentation does not contain sufficient information for Council to assess the proposed driveway.
Information Required
14. Provide additional detail on the proposed driveway and crossover. The detail must be prepared by a suitably
qualified person (RPEQ – Registered Professional Engineer of Queensland) and include, but not be limited to:
a. dimensions, levels and grade of the access driveway; and
Response: Refer attached sketch drawing M3024E R01 A detailing levels and grade of the access driveway. A
longitudinal section located 1m off the western side of the driveway has been chosen as the “worst case grade
scenario”.
b. demonstrate that a B99 vehicle will not scrape or bottom out while entering or exiting the driveway.
Response: Refer attached sketch drawing M3024E R01 A demonstrating that a B99 vehicle will not scrape
or bottom while entering or exiting the access driveway. A longitudinal section located 1m off the western
side of the driveway has been chosen as the “worst case grade scenario” and provides clearance of
approximately 20mm for a B99 vehicle.
JFP Ref: M3024E-001 Page 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment E_Engineering_Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.