Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 11 5.0 Conclusions This report has outlined a total water cycle strategy to be adopted in the construction and operational works phase of the development which satisfies the acceptable solutions set out in Councils planning scheme policies. Wastewater minimisation strategies will be adopted to reduce the demand on Council’s existing infrastructure, Best practice and practical water quality improvement devices are proposed which include 55,000L of rainwater harvesting, and a Bio-retention basin area of 95m 2, Due to the site’s location adjacent to the point of discharge into Noosa River, no detention volume is proposed.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.