Stormwater Management Plan
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 10 4.0 Stormwater Quantity Management The subject site is located adjacent to the Noosa River Esplanade where a portion of the site currently sheet flows into. This is deemed the lawful point of discharge for the subject site as no other practical stormwater connection exists for the site. The site is directly adjacent to the point of discharge into the Noosa River, resulting in a very small time of concentration for the proposed development compared to that of any upstream catchments. On-site detention would therefore have no beneficial impact to peak flow discharge rates. As such, no detention is proposed within the development.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.