Skip to the record
Accept no imitations.

Original source · versioned page text

Stormwater Management Plan

Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.

of 19

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
SC5551 - 28 Elkhorn Dr, Tewantin                                                                           5




2.0 Water Cycle Management

2.1      Background
The purpose of this section of the SWMP is to outline water saving measures that will be implemented in
the design and construction of the proposed development.


2.2      Wastewater Minimisation
To reduce the impact of water demand from the development and to minimise the loading on the existing
sewerage network, it is intended to reduce the wastewater leaving the site through the use of “at source”
measures. This will include:
         Water saving shower roses with a AAA rating or better
         Dual flush toilet cisterns that do not exceed 6 litres on full flush and 3 litres on half flush
         The use of 3 star (or higher) water efficient appliances


2.3      Stormwater Harvesting Tanks
In an effort to reduce the demand on town water supply and to assist with meeting water quality objectives
for this development, it is proposed to incorporate stormwater harvesting tanks on each lot within the
hydraulic design of the proposed development. A total volume of 55,000L is proposed, with a minimum of
50% of the roof area to be connected with first flush diversion capabilities as determined using MUSIC
modelling to achieve water quality objectives, refer section 3.0.
Log in to download the original file

Stormwater Management Plan.pdf · 899 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.