Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 5 2.0 Water Cycle Management 2.1 Background The purpose of this section of the SWMP is to outline water saving measures that will be implemented in the design and construction of the proposed development. 2.2 Wastewater Minimisation To reduce the impact of water demand from the development and to minimise the loading on the existing sewerage network, it is intended to reduce the wastewater leaving the site through the use of “at source” measures. This will include: Water saving shower roses with a AAA rating or better Dual flush toilet cisterns that do not exceed 6 litres on full flush and 3 litres on half flush The use of 3 star (or higher) water efficient appliances 2.3 Stormwater Harvesting Tanks In an effort to reduce the demand on town water supply and to assist with meeting water quality objectives for this development, it is proposed to incorporate stormwater harvesting tanks on each lot within the hydraulic design of the proposed development. A total volume of 55,000L is proposed, with a minimum of 50% of the roof area to be connected with first flush diversion capabilities as determined using MUSIC modelling to achieve water quality objectives, refer section 3.0.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.