Original source · versioned page text
Stormwater Management Plan
Attached to the e-mail REC16/0014 - Planning report & supporting management plans, contour plan 2 of 2.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSC5551 - 28 Elkhorn Dr, Tewantin 6 3.0 Water Quality Management 3.1 Background A requirement of the proposed development is that Stormwater quality treatment shall be provided to meet the design objectives set out in Section 2.4 of DERM’s Urban Stormwater Quality Planning guidelines 2010 and the associated with State Planning Policy (SPP) 4/10 Healthy Waters. The scope typically encompasses the ‘post construction’ phase of the development however ‘construction phase’ water quality is briefly addressed. 3.2 Construction Phase Table 3.1 has been adapted from Table C4.1 of Brisbane City Council’s (BCC) Stormwater Best Management Practices 2000 and details the typical stormwater pollutants which may be generated during the construction phase of the development. Pollutant Sources Litter Paper, construction packaging, food packaging, cement bags and off-cuts Sediment Unprotected exposed soils and stockpiles during earthworks and building Hydrocarbons Fuel and oil spills, leaks from construction equipment Toxic Materials Cement slurry, solvents, cleaning agents, wash waters pH Altering Substances Cement slurry, wash waters Table 3.1 –Typical Construction Phase Pollutants The following measures should typically be implemented prior to the commencement of construction: Education of all site workers in sediment and erosion procedures Specified storage areas for construction materials and plant that are bunded to prevent any spillages from escaping
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.