Delegated Report - Code - Planning OPW22 0319 [As Published] · OPW22/0319

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                              Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
                              Development / Development Tools & Guidelines / As-Constructed Guidelines.
                      c.      The “As-Constructed” drawings will require certification by a:
                              i.       Qualified experienced Civil Engineer (RPEQ) confirming design intent and
                                       conformance with applicable standards and specifications, along with the
                                       relevant descriptions of assets, services and structures and;
                              ii.      Licensed Surveyor in regard to the cadastral and locational information, levels
                                       and applicable survey datum.
                      d.      The data must be in accordance with Council’s “Planning Scheme Policy 6 –
                              Engineering Design Standards”, and fully detail the levels for all engineering works
                              including but not limited to the drainage network and structures, finished ground and
                              pavement surface levels;
                      e.      Landscaping, including all assets and improvements within parks, open space and road
                              reserves areas are to be shown on an accompanying separate landscape plan
                              (prepared in .dwg file format with accompanying hardcopy PDFs) and include a
                              complaint ADAC XML file. Details of the landscaping and all associated assets and
                              improvements may be included in the ADAC XML digital file prepared for associated
                              civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file
                              containing landscape and asset information only; and
                      f.      A condition report of the drainage system must be completed for agreement by Council
                              prior to the commencement of the “On Maintenance” period. The condition report is to
                              include a CCTV inspection of the newly constructed pipe crossing Toolar Street and
                              associated structures (newly constructed manhole and existing Council stormwater
                              pit).
                      On Maintenance
               48.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
                      Maintenance’, the supervising RPEQ must submit to Council:
                      a.      certification that all works have been undertaken and completed in accordance with the
                              requirements of this Permit;
                      b.      as Constructed details in accordance with Council’s Planning Scheme Policy; and
                      c.      maintenance and operational manuals for all proprietary or site specific devices.
                      Off Maintenance
               49.    Prior to requesting an Off Maintenance inspection, the developer must provide a written
                      request for the Off Maintenance inspection which must include a condition report of the
                      drainage system must be completed for agreement by Council. The condition report is to
                      include a CCTV inspection of the newly constructed pipe crossing Toolar Street and
                      associated structures (newly constructed manhole and existing Council stormwater pit).
               50.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      a Council inspection reveals works do not comply with approval requirements; and
                      b.      submitted certification falsely states works comply with approval requirements.
               51.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
               5.     REFERRAL AGENCIES

               Not applicable.

                                                                                                       Page 11 of 13

Document Set ID: 22371387
Version: 5, Version Date: 28/04/2023


[OCR of page images]
Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
Development / Development Tools & Guidelines / As-Constructed Guidelines.

Cc. The “As-Constructed” drawings will require certification by a:

i. Qualified experienced Civil Engineer (RPEQ) confirming design intent and
conformance with applicable standards and specifications, along with the
relevant descriptions of assets, services and structures and;

ii. Licensed Surveyor in regard to the cadastral and locational information, levels
and applicable survey datum.

d. The data must be in accordance with Council’s “Planning Scheme Policy 6 —
Engineering Design Standards”, and fully detail the levels for all engineering works
including but not limited to the drainage network and structures, finished ground and
pavement surface levels;

e. Landscaping, including all assets and improvements within parks, open space and road
reserves areas are to be shown on an accompanying separate landscape plan
(prepared in .dwg file format with accompanying hardcopy PDFs) and include a
complaint ADAC XML file. Details of the landscaping and all associated assets and
improvements may be included in the ADAC XML digital file prepared for associated
civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file
containing landscape and asset information only; and

f. A condition report of the drainage system must be completed for agreement by Council
prior to the commencement of the “On Maintenance” period. The condition report is to
include a CCTV inspection of the newly constructed pipe crossing Toolar Street and
associated structures (newly constructed manhole and existing Council stormwater

pit).
On Maintenance

48. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
Maintenance’, the supervising RPEQ must submit to Council:

a. certification that all works have been undertaken and completed in accordance with the
requirements of this Permit;

b. as Constructed details in accordance with Council’s Planning Scheme Policy; and
Cc. maintenance and operational manuals for all proprietary or site specific devices.
Off Maintenance

49. Prior to requesting an Off Maintenance inspection, the developer must provide a written
request for the Off Maintenance inspection which must include a condition report of the
drainage system must be completed for agreement by Council. The condition report is to
include a CCTV inspection of the newly constructed pipe crossing Toolar Street and
associated structures (newly constructed manhole and existing Council stormwater pit).

50. Are-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:

a. a Council inspection reveals works do not comply with approval requirements; and
b. submitted certification falsely states works comply with approval requirements.

51. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.

5. REFERRAL AGENCIES
Not applicable.

Page 11 of 13

Document Set ID: 22371387
Version: 5, Version Date: 28/04/2023

Used in these records

About this file

File size
893 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning OPW22 0319 [As Published].pdf · 893 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.