Delegated Report - Code - Planning OPW22 0319 [As Published] · OPW22/0319
Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
Development / Development Tools & Guidelines / As-Constructed Guidelines.
c. The “As-Constructed” drawings will require certification by a:
i. Qualified experienced Civil Engineer (RPEQ) confirming design intent and
conformance with applicable standards and specifications, along with the
relevant descriptions of assets, services and structures and;
ii. Licensed Surveyor in regard to the cadastral and locational information, levels
and applicable survey datum.
d. The data must be in accordance with Council’s “Planning Scheme Policy 6 –
Engineering Design Standards”, and fully detail the levels for all engineering works
including but not limited to the drainage network and structures, finished ground and
pavement surface levels;
e. Landscaping, including all assets and improvements within parks, open space and road
reserves areas are to be shown on an accompanying separate landscape plan
(prepared in .dwg file format with accompanying hardcopy PDFs) and include a
complaint ADAC XML file. Details of the landscaping and all associated assets and
improvements may be included in the ADAC XML digital file prepared for associated
civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file
containing landscape and asset information only; and
f. A condition report of the drainage system must be completed for agreement by Council
prior to the commencement of the “On Maintenance” period. The condition report is to
include a CCTV inspection of the newly constructed pipe crossing Toolar Street and
associated structures (newly constructed manhole and existing Council stormwater
pit).
On Maintenance
48. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance with the
requirements of this Permit;
b. as Constructed details in accordance with Council’s Planning Scheme Policy; and
c. maintenance and operational manuals for all proprietary or site specific devices.
Off Maintenance
49. Prior to requesting an Off Maintenance inspection, the developer must provide a written
request for the Off Maintenance inspection which must include a condition report of the
drainage system must be completed for agreement by Council. The condition report is to
include a CCTV inspection of the newly constructed pipe crossing Toolar Street and
associated structures (newly constructed manhole and existing Council stormwater pit).
50. A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. a Council inspection reveals works do not comply with approval requirements; and
b. submitted certification falsely states works comply with approval requirements.
51. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
5. REFERRAL AGENCIES
Not applicable.
Page 11 of 13
Document Set ID: 22371387
Version: 5, Version Date: 28/04/2023
[OCR of page images]
Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
Development / Development Tools & Guidelines / As-Constructed Guidelines.
Cc. The “As-Constructed” drawings will require certification by a:
i. Qualified experienced Civil Engineer (RPEQ) confirming design intent and
conformance with applicable standards and specifications, along with the
relevant descriptions of assets, services and structures and;
ii. Licensed Surveyor in regard to the cadastral and locational information, levels
and applicable survey datum.
d. The data must be in accordance with Council’s “Planning Scheme Policy 6 —
Engineering Design Standards”, and fully detail the levels for all engineering works
including but not limited to the drainage network and structures, finished ground and
pavement surface levels;
e. Landscaping, including all assets and improvements within parks, open space and road
reserves areas are to be shown on an accompanying separate landscape plan
(prepared in .dwg file format with accompanying hardcopy PDFs) and include a
complaint ADAC XML file. Details of the landscaping and all associated assets and
improvements may be included in the ADAC XML digital file prepared for associated
civil infrastructure, or alternatively, be provided as a separate ADAC XML digital file
containing landscape and asset information only; and
f. A condition report of the drainage system must be completed for agreement by Council
prior to the commencement of the “On Maintenance” period. The condition report is to
include a CCTV inspection of the newly constructed pipe crossing Toolar Street and
associated structures (newly constructed manhole and existing Council stormwater
pit).
On Maintenance
48. All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
Council’s relevant Planning Scheme Policy prior to plan sealing. To achieve ‘On
Maintenance’, the supervising RPEQ must submit to Council:
a. certification that all works have been undertaken and completed in accordance with the
requirements of this Permit;
b. as Constructed details in accordance with Council’s Planning Scheme Policy; and
Cc. maintenance and operational manuals for all proprietary or site specific devices.
Off Maintenance
49. Prior to requesting an Off Maintenance inspection, the developer must provide a written
request for the Off Maintenance inspection which must include a condition report of the
drainage system must be completed for agreement by Council. The condition report is to
include a CCTV inspection of the newly constructed pipe crossing Toolar Street and
associated structures (newly constructed manhole and existing Council stormwater pit).
50. Are-inspection fee in accordance with Council’s Fees and Charge Register will be charged
where:
a. a Council inspection reveals works do not comply with approval requirements; and
b. submitted certification falsely states works comply with approval requirements.
51. A final inspection and approval of the new driveway and completed reinstatement works by
Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
inspection.
5. REFERRAL AGENCIES
Not applicable.
Page 11 of 13
Document Set ID: 22371387
Version: 5, Version Date: 28/04/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning OPW22 0319 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 893 KB (small file)
- File type
No other editions are linked here.