Original PDF page 7, section 1. The text section number identifies this passage in the reader.

    SEDIMENT RELEASE GUIDELINES

    1.    ALL RELEASES OF STORMWATER CAPTURED ONSITE, UNLESS OTHERWISE NOTED IN THIS                                                                                                                                                                                                                                                                                                                             WRAP FILTER
                                                                                                                                                            1 METER MAX.                      STAR PICKETS
          STANDARD, MUST NOT EXCEED THE FOLLOWING LIMITS:                                                                                                                                                                                                                                                                                                                                                        CLOTH OVER GRATE
    ·     50mg/L OF TOTAL SUSPENDED SOLIDS (TSS) AS A MAXIMUM CONCENTRATION;                                                                                                                DROP INLET
    ·     TURBIDITY (NTU) VALUE LESS THAN 10% ABOVE BACKGROUND;                                                                                                                             WITH GRATE
    ·     pH VALUE MUST BE IN THE RANGE 6.5 TO 8.5 EXCEPT WHERE, AND TO THE EXTENT THAT, THE
          NATURAL RECEIVING WATERS LIE OUTSIDE THIS RANGE.                                                                                                                                  WIRE OR STEEL MESH
    2.    THE CONCENTRATION OF TSS RELEASED BY DEWATERING MAY ONLY EXCEED 50mg/L WHERE IT                                                                                                   (14 GAUGE x 150mm
          CAN BE DEMONSTRATED AND SUPPORTED THROUGH DOCUMENTATION THAT:                                                                                                                     OPENINGS) WHERE
    ·     FURTHER SIGNIFICANT RAINFALL IS FORECAST TO OCCUR BEFORE THE TSS CONCENTRATION IS                                                                                                 GEOTEXTILE IS NOT
                                                                                                                                                                                            SELF-SUPPORTING
          LIKELY TO BE REDUCED TO 50mg/L;
    ·     RELEASING A HIGHER CONCENTRATION OF TOTAL SUSPENDED SOLIDS WILL RESULT IN A                                                                                                         WOVEN GEOTEXTILE
          BETTER ENVIRONMENTAL OUTCOME BY PROVIDING STORAGE FOR THE CAPTURE AND
          TREATMENT OF RUN-OFF FROM THE IMMINENT RAINFALL AND RUN-OFF.
    ·     ALL REASONABLE AND PRACTICABLE STEPS HAVE BEEN TAKEN TO TREAT THE WATER WITHIN




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            500 - 600mm
          BEST-PRACTICE TIME FRAMES;
    ·     FLOCCULENT HAS BEEN APPROPRIATELY APPLIED AND THE CONCENTRATION OF TSS IN THE                                                                                                 STAR PICKET
                                                                                                                                                                                        FITTED WITH                                                                                                                                                                      WRAP FILTER CLOTH
          CAPTURED WATER HAS ALREADY SIGNIFICANTLY DECREASED.                                                                                                                                                                                                                                                                                     RUNOFF                 OVER GRATE
    3.    FOR ALL OTHER STORMWATER RELEASES, FLOWS AND DISCHARGES FROM THE SITE, THE                                                                                                    SAFETY CAP
                                                                                                                                                                                                                                                                                                                                                  WATER WITH                                                                                                                                                           1.5m STAR PICKETS AT MAX.
          RELEASE LIMIT PRESCRIBED IN (1A) ABOVE MUST NOT BE EXCEEDED UNLESS THE                                                                                                                                                                                                                                                                  SEDIMENT                                                                                                                                                             2.5m CENTRES
          DEVELOPMENT IS IN FULL COMPLIANCE WITH THIS STANDARD.
                                                                                                                                      SANDBAGS                                 WOVEN GEOTEXTILE
    SEDIMENT CONTROL
    1. ALL SEDIMENT AND EROSION CONTROL MEASURES TO BE IN ACCORDANCE WITH INTERNATIONAL                                                                                                   RUNOFF                                                                                                                                                                                                                                                                                                                       SELF-SUPPORTING




                                                                                                                                                            FLOW
       EROSION CONTROL ASSOCIATION (IECA) AUSTRALIA GUIDELINES AND THE SPECIFICATIONS.                                                                                                    WATER WITH                                                                                                                                                                                        FILTERED                                                                                                                   GEOTEXTILE
    2. SEDIMENT AND EROSION CONTROL DETAILS SHOWN ARE MINIMUM REQUIREMENTS. IT IS THE                                                                                                     SEDIMENT                                                                                                                                                                                           WATER
                                                                                                                                      WATERWAY                                                                                                                                                                                                                                                                                                                                                                                   FLOW
       CONTRACTORS RESPONSIBILITY TO INSTALL ADDITIONAL CONTROL MEASURES AS DEEMED                                                                                                                                                                                                                                                                                                                                                                                                                               DIRECTION OF
       NECESSARY THROUGHOUT CONSTRUCTION.
    3. THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN ALL SEDIMENT CONTROL DEVICES IN A                                                                                                                                                                                                                                                                      GEOTEXTILE INLET FILTER TYPE B
       FUNCTIONAL ORDER AND REPLACE ALL BLOCKED SEDIMENT DEVICES AS REQUIRED UNTIL                                                    EXCAVATION                                                                                                                                                                                                                          SCALE N.T.S
       SUCCESSFUL OFF MAINTENANCE OF WORKS.                                                                                                                                                                                                FILTERED                                                                                                                                                                                                                                                                    ON SOIL, 150mm x 100mm
    4. CONSTRUCTION OF ALL SEDIMENT MANAGEMENT DEVICES TO THE SATISFACTION OF THE                                                                                                                                                           WATER                                                                                                                                                                                                                                                                      TRENCH WITH COMPACTED
       SUPERINTENDENT. SHALL BE COMPLETED AND EFFECTIVE PRIOR TO:                                                                                                                         GEOTEXTILE                                                                                                                                                                                                                                                                                                                   BACKFILL AND ON ROCK, SET
       a. STRIPPING OF TOPSOIL AND GRASS.                                                                                             EARTH BANK                                          EMBEDDED 150mm                                                                                                                                                                                                                                                                                                               INTO SURFACE CONCRETE
       b. BULK EARTHWORKS TO THE SITE.                                                                                                                                                    INTO GROUND                                                                                                                                                                     PROVIDE WASH WATER FOR
       c. SERVICES INSTALLATION.                                                                                                                                                                                                                                                                   TIMBER SLEEPER OR METAL                                                TRUCKS EXITING SITE
       d. PAVEMENT CONSTRUCTION                                                                                                                                                FOR DROP INLETS AT NON-SAG POINTS,                                                                                  GRID 100mm HIGH AND




                                                                                                                                                                                                                                                                                                                                                                                                                                                                            600mm MIN.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  SECTION DETAIL
    5. ALL SEDIMENT MANAGEMENT MEASURES ARE TO REMAIN IN PLACE UNTIL INSTRUCTION IS                                                                                            SANDBAGS, EARTH BANK OR EXCAVATION USED                                                                             SPACED AT 300mm CTS                                                     MIN LE
       RECEIVED IN WRITING FROM THE SUPERINTENDENT TO REMOVE ALL OR PART OF THE SILT                                                                                                                                                                                                                                                                                             NGTH
                                                                                                                                                                               TO CREATE ARTIFICIAL SAG POINT                                                                                                                                                                         1      0m
       CONTROL APPLICATIONS.                                                                                                                                                                                                                                                                                                                                                                                             BERM 300 HIGH MIN
                                                                                                                                                                                                                                                                                                CONSTRUCTION SITE
    6. THE BULK EARTHWORKS AND SEDIMENT CONTROL LAYOUT PLAN SHALL BE READ IN                                                            GEOTEXTILE INLET FILTER CONSTRUCTION NOTES:
       CONJUNCTION WITH THE APPROVED DRAWINGS.




                                                                                                                                                                                                                                                                                                                                                                                                                                                         MIN. 1.5m
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                           20m MAX.
    7. PRIOR TO COMMENCEMENT OF CONSTRUCTION APPROVAL IS TO BE OBTAINED FROM THE                                                        1.   FABRICATE A SEDIMENT BARRIER MADE FROM GEOTEXTILE OR STRAW BALES.                                                                                                                                                                                                                   EXISTING ROADWAY
       SUPERINTENDENT FOR THE LOCATION OF THE SITE ACCESS POINT AND WASH DOWN AREA                                                                                                                                                                                                                                                                                                                                                                                                                                        FLOW
       WHICH ARE TO BE MAINTAINED THROUGHOUT THE CONSTRUCTION PERIOD.                                                                   2.   PICKET SPACING TO BE A MAXIMUM 1.0m CENTRES.
    8. IF SEDIMENT AND EROSION CONTROL DEVICES HAVE BEEN FOUND TO BE DIFFERENT OR FAILED                                                                                                                                                                                                                                                                                                                                                                                            STAR PICKETS AT
       IN SERVICE, CORRECTIVE ACTION IS TO BE UNDERTAKEN IMMEDIATELY WHICH MAY INCLUDE                                                                                                                                                                                                         GEOTEXTILE FABRIC                                                                                                                                                                    MAX. 2.5m SPACINGS
                                                                                                                                        3.   IN WATERWAYS, ARTIFICIAL SAG POINTS CAN BE CREATED WITH SANDBAGS OR EARTH
       AMENDMENTS' ADDITIONS TO THE ORIGINAL APPROVED EROSION CONTROL PLANS. SUCH                                                            BANKS AS SHOWN IN THE DRAWING.                                                                                                                                                                                                                                                                                                         TYPICAL
       AMENDMENTS ARE TO BE APPROVED BY SUPERINTENDENT, IF DEEMED NECESSARY AND                                                                                                                                                                                                                                                                                           50-75mm GRAVEL BED MIN
       RELEVANT.                                                                                                                        4.   DO NOT COVER THE INLET WITH GEOTEXTILES UNLESS THE DESIGN IS ADEQUATE TO                                                                                                                                                     200mm THICK
    9. OVERALL
                                                                                                                                             ALLOW FOR ALL WATERS TO BYPASS IT.
       a. TEMPORARY DRAINAGE CONTROL FLOWS SHOULD BE DIVERTED AROUND THE WORK SITE                                                                                                                                                                                                                                               RUNOFF FROM PAD DIRECTED TO                                                                                                                                                  PLAN
           WHERE POSSIBLE.                                                                                                                                                                                                                                                                                                       SEDIMENT TRAP
       b. ALL DRAINAGE, EROSION AND SEDIMENT CONTROLS TO BE INSTALLED AND BE OPERATIONAL
                                                                                                                                                                   GEOTEXTILE INLET FILTER A
          BEFORE COMMENCING UP-SLOPE EARTHWORKS.                                                                                                                                SCALE N.T.S
       c. IN AREAS WHERE RUNOFF TURBIDITY IS TO BE CONTROLLED, EXPOSED SURFACES TO BE
                                                                                                                                                                                                                                                                                                                     TEMPORARY CONSTRUCTION VEHICLE EXIT
          EITHER MULCHED, COVERED WITH EROSION CONTROL BLANKETS OR TURFED IF                                                                                                                                                                                                                                                                             SCALE: N.T.S.
          EARTHWORKS ARE EXPECTED TO BE DELAYED FOR MORE THAN 14 DAYS.
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  DIRECTION
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          DISTURBED                                     1.5m STAR PICKETS AT
    SEDIMENT FENCE                                                                                               TIMBER SPACER TO SUIT                                  KERB-SIDE INLET                                                                                                                                                                                                                                                                                                                           OF FLOW
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                          AREA                                          MAX. 2.5m CENTRES
    10. FOR SEDIMENT FENCE STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL
        EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWINGS
        SF-01 AND SF-02 SEDIMENT FENCE.
    TEMPORARY CONSTRUCTION ENTRY/EXIT
    11. FOR CONSTRUCTION ENTRY / EXIT STANDARD DETAIL AND SPECIFICATION REFER TO
        INTERNATIONAL EROSION CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES
        STANDARD DRAWINGS EXIT-01 AND EXIT-02 CONSTRUCTION EXIT - ROCK PAD (CONSTRUCTION
        SITES ONLY), EXIT-03 - ROCK PADS FOR BUILDING SITES AND EXIT-04 AND EXIT-05
        CONSTRUCTION EXIT - VIBRATION GRID.
    KERB INLET                                                                                                                                                     GRAVEL-FILLED WIRE MESH OR
    12. FOR KERB INLET STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION                                                                            GEOTEXTILE "SAUSAGE"
        CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING ESC-03                                                                                                                                                                                                                                                                                                                                                                                                     UNDISTURBED
        KERB INLET SEDIMENT TRAPS
                                                                                                                                       OVERFLOW                                                                                                                                                                                                                                                                                                                                           AREAS
    REVEGETATION                                                                                                                                             TIMBER SPACER
                                                                                                      RUNOFF
    13. FOR REVEGETATION STANDARD SPECIFICATION REFER TO INTERNATIONAL EROSION CONTROL                                                                       TO SUIT
        ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING R-01 REVEGETATION              WATER WITH
        GENERAL.                                                                                      SEDIMENT
    FIELD INLET                                                                                                                                                                                                      GRADIENT OF
    14. FOR FIELD INLET STANDARD DETAIL AND SPECIFICATION REFER TO INTERNATIONAL EROSION                                                                                                                             DRAIN 1% TO 5%                                        CAN BE CONSTRUCTED                                 ALL BATTER GRADES
        CONTROL ASSOCIATION AUSTRALASIA (IECA) BEST PRACTICES STANDARD DRAWING ESC-02                                                                                                                                                                                      WITH OR WITHOUT                                    2(H):1(V) MAX.
        GRATED STORMWATER (FIELD) INLET SEDIMENT TRAP.                                                       SEDIMENT                                                                                                                                                      CHANNEL
    OPERATION AND MAINTENANCE
    15. IN ACCORDANCE WITH IECA GUIDELINES, ALL ESC MEASURES SHALL BE INSPECTED: · AT LEAST                                                                                                                           DIRECTION                                                                                                                                                                                    STABILISE STOCKPILE SURFACE
                                                                                                       GRAVEL-FILLED WIRE MESH                                         FILTERED WATER                                                      OF FLOW
                                                                                                                                                                                                                                                                                                                                                                                                                                                         SEDIMENT FENCE CONSTRUCTION NOTES:
        DAILY (WHEN WORK IS OCCURRING ON SITE) OR WEEKLY (WHEN WORK IS NOT OCCURRING ON




                                                                                                                                                                                                                                                                                                                                         .
                                                                                                                                                                                                                                                                                                                                                        EARTH BANK




                                                                                                                                                                                                                                                                                                                                      300mm MIN
                                                                                                       OR GEOTEXTILE "SAUSAGE"                                                                                                                                                                                                                                                                                   2:1
        SITE) · WITHIN 24 HOURS OF EXPECTED RAIN; AND · WITHIN 18 HOURS OF A RAINFALL EVENT (I.E.                                                                                                                                                                                                                                                                                                  X   .)              SL
                                                                                                                                                                                                                                                                                                                                                                                                MA                       OP                              1.          CONSTRUCT SEDIMENT FENCES AS CLOSE AS POSSIBLE TO BEING PARALLEL TO
        AN EVENT OF SUFFICIENT INTENSITY AND DURATION TO MOBILISE SEDIMENT ON SITE).
                                                                                                                                                                                                                                                                                                                                                                                            PE(                            E(                                        THE CONTOURS OF THE SITE, BUT WITH SMALL RETURNS AS SHOWN IN THE
                                                                                                                                                                                                                                                                                                                                                               FLOW                       O                                     MA
    16. IN ACCORDANCE WITH IECA ESC GUIDELINES, MAINTENANCE OF ESC MEASURES SHALL OCCUR                                                                                                                                                                                                                                                                                              SL                                           X.)
        IN ACCORDANCE WITH THE FOLLOWING TABLE:                                                                                                                                                                                                                                                                                                                                2:1                                                                                   DRAWING TO LIMIT THE CATCHMENT AREA OF ANY ONE SECTION. THE
                                                                                                                                                                                                                                                                                  2m MIN                                                                                                                                                                             CATCHMENT AREA SHOULD BE SMALL ENOUGH TO LIMIT WATER FLOW IF
    REPORTING                                                                                                     MESH & GRAVEL INLET FILTER CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     CONCENTRATED AT ONE POINT TO 50 LITRES PER SECOND IN THE DESIGN
                                                                                                                                                                                                                             150mm MIN



    17. CONTRACTOR IS TO PROVIDE AN UPDATED PROGRAM OF ESC MAINTENANCE AND CONTROL OF
        ALL STAGES OF WORK FOR APPROVAL BY THE SUPERINTENDENT.                                                                                                                                                                                                                                                                                                                                                                                                       STORM EVENT, USUALLY THE 10-YEAR EVENT.
                                                                                                                  1.    INSTALL FILTERS TO KERB INLETS ONLY AT SAG POINTS.                                                                              NOTE: ONLY TO BE USED AS TEMPORARY BANK                                                                                                                SEDIMENT FENCE
                                                                                                                                                                                                                                                        WHERE MAXIMUM UPSLOPE LENGTH IS 80 METRES.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         2.          CUT A 150mm DEEP TRENCH ALONG THE UPSLOPE LINE OF THE FENCE FOR THE
                                                                                                                  2.    FABRICATE A SLEEVE MADE FROM GEOTEXTILE OR WIRE
                                                                                                                                                                                                                                                                                                                                                                                                                                                                     BOTTOM OF THE FABRIC TO BE ENTRENCHED.
                                                                                                                        MESH LONGER THAN THE LENGTH OF THE INLET PIT AND
                                                                                                                        FILL IT WITH 25mm TO 50mm GRAVEL.                                                           DIVERSION DRAIN CONSTRUCTION NOTES:                                                                                                   STOCKPILE CONSTRUCTION NOTES:
                                                                                                                                                                                                                                                                                                                                                                                                                                                         3.          DRIVE 1.5m LONG STAR PICKETS INTO GROUND AT 2.5m INTERVALS (MAX.) AT
                                                                                                                                                                                                                    1.     BUILD WITH GRADIENTS BETWEEN 1% AND 5%.                                                                                        1.    PLACE STOCKPILES MORE THAN 2 (PREFERABLY 5) METRES FROM EXISTING                                     THE DOWNSLOPE EDGE OF THE TRENCH. ENSURE ANY STAR PICKETS ARE
                                                                                                                  3.    FORM AN ELLIPTICAL CROSS-SECTION ABOUT 150mm HIGH
                                                                                                                                                                                                                                                                                                                                                                VEGETATION, CONCENTRATED WATER FLOW, ROADS AND HAZARD AREAS.                                         FITTED WITH SAFETY CAPS.
                                                                                                                        x 400mm WIDE.
                                                                                                                                                                                                                     2.     AVOID REMOVING TREES AND SHRUBS IF POSSIBLE - WORK AROUND THEM.
                                                                                                                                                                                                                                                                                                                                                          2.    CONSTRUCT ON THE CONTOUR AS LOW, FLAT, ELONGATED MOUNDS.                                 4.          FIX SELF-SUPPORTING GEOTEXTILE TO THE UPSLOPE SIDE OF THE POSTS
                                                                                                                  4.    PLACE THE FILTER AT THE OPENING LEAVING AT LEAST A
                                                                                                                                                                                                                     3.    ENSURE THE STRUCTURES ARE FREE OF PROJECTIONS OR OTHER                                                                                                                                                                                    ENSURING IT GOES TO THE BASE OF THE TRENCH. FIX THE GEOTEXTILE WITH
                                                                                                                        100mm SPACE BETWEEN IT AND THE KERB INLET. MAINTAIN
                                                                                                                                                                                                                           IRREGULARITIES THAT COULD IMPEDE WATER FLOW.                                                                                   3.    WHERE THERE IS SUFFICIENT AREA, TOPSOIL STOCKPILES SHALL BE LESS                                     WIRE TIES OR AS RECOMMENDED BY THE MANUFACTURER. ONLY USE
                                                                                                                        THE OPENING WITH SPACER BLOCKS.
                                                                                                                                                                                                                                                                                                                                                                THAN 2 METRES IN HEIGHT.                                                                             GEOTEXTILE SPECIFICALLY PRODUCED FOR SEDIMENT FENCING. THE USE OF
                                                                                                                                                                                                                     4.    BUILD THE DRAINS WITH CIRCULAR, PARABOLIC OR TRAPEZOIDAL                                                                                                                                                                                  SHADE CLOTH FOR THIS PURPOSE IS NOT SATISFACTORY.
                                                                                                                  5.    FORM A SEAL WITH THE KERB TO PREVENT SEDIMENT
                                                                                                                        BYPASSING THE FILTER.                                                                              CROSS-SECTIONS, NOT "V" SHAPED.                                                                                                4.    WHERE THEY ARE TO BE PLACE FOR MORE THAN 10 DAYS, STABILISE
                                                                                                                                                                                                                                                                                                                                                                FOLLOWING THE APPROVED ESCP OR SWMP TO REDUCE THE C-FACTOR TO                            5.          JOIN SECTIONS OF FABRIC AT A SUPPORT POST WITH A 150mm OVERLAP.
                                                                                                                  6.    SANDBAGS FILLED WITH GRAVEL CAN SUBSTITUTE FOR THE                                           5.    ENSURE BANKS ARE PROPERLY COMPACTED TO PREVENT FAILURE.                                                                              LESS THAN 0.10.
                                                                                                                                                                                                                                                                                                                                                                                                                                                         6.          BACKFILL THE TRENCH OVER THE BASE OF THE FABRIC AND COMPACT IT
                                                                                                                        MESH OR GEOTEXTILE PROVIDING THEY ARE PLACED SO
                                                                                                                                                                                                                     6.     COMPLETE PERMANENT OR TEMPORARY STABILISATION WITHIN 10 DAYS                                                                  5.    CONSTRUCT EARTH BANKS ON THE UPSLOPE SIDE TO DIVERT WATER                                            THOROUGHLY OVER THE GEOTEXTILE.
                                                                                                                        THAT THEY CAN FIRMLY ABUT EACH OTHER AND
                                                                                                                        SEDIMENT-LADEN WATERS CANNOT PASS BETWEEN.                                                          OF CONSTRUCTION.                                                                                                                    AROUND STOCKPILES AND SEDIMENT FENCES 1 TO 2 METRES DOWNSLOPE.

                                                                                                                             MESH & GRAVEL INLET FILTER                                                                                                                                                                                                                                                                                                                                        SEDIMENT FENCE
                                                                                                                                                                                                                                                           DIVERSION DRAIN                                                                                                                        STOCKPILES                                                                                           SCALE: N.T.S.
                                                                                                                                             SCALE N.T.S                                                                                                            SCALE N.T.S                                                                                                                             SCALE N.T.S



   NOT FOR CONSTRUCTION
   ----      ----     ----                                                   ----    ----      North Point      Approved                                                                                                                                                                                                               Project Address                                                                                  Title

   ----      ----     ----                                                   ----    ----
                                                                                                                E. WHITMORE
                                                                                                                                                                                                                                                                                                                                        12 GYMPIE STREET, TEWANTIN                                                                      SEDIMENT AND EROSION CONTROL NOTES AND DETAILS
   ----      ----     ----                                                   ----    ----                       31423      11.11.25
   ----      ----     ----                                                   ----    ----                       For and on behalf of RECOR Pty Ltd.

   ----      ----     ----                                                   ----    ----                       Scale                                                                                                                    ENGINEERING & PROJECT SERVICES                                                                Client Details                                                                                   Project Name                                                                                                Sheet Size
                                                                                                                                                                                                                                            SUNSHINE COAST | BRISBANE
  17.02.26
ISSUED   FOR OPW APPROVAL
                   ISSUED FOR OPW APPROVAL                                   CS      EW                                                               NTS                                                                                  www.recor.au | ABN 89 647 469 707                                                            NOVATO GROUP                                                                                    7 LOT RESIDENTIAL SUBDIVISION                                                                                  A1
    A      11.11.25   ISSUED FOR OPW APPROVAL                                AY      EW                                                                                                         COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's                                                                                                                     Project Number                                                Drawing Number                                 Revision
                                                                                                                                                                                                 client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as

  Rev      Date                   Revision Description                    Drawn Check                                                  DO NOT SCALE, IF IN DOUBT ASK                                                                   'Issued For Construction' in the revision description.                                                                                                                                           P0198-25-001                                                  C125                                             A
Log in to download the original file

RFI - P0352-25-003-02-GYMPIE-ST-TEWANTIN.pdf · 23.5 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.