Original source · versioned page text
Rfi - P0352-25-003-02-GYMPIE-ST-TEWANTIN
Very large file (23.5 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 6, section 2. The text section number identifies this passage in the reader.
509171022
WS 6C
D
Ex
3.92
4.6 HY
4.90 4.4
0 ExT
20
4.000
4.9
4.5
NOOMK
E E E 9001
4.6
STOP 509171
3.873
025 ExW ExW
WSV
4.5 4.8
4.5
3.7
CH0.00
ExT
ExD
9000
ExD
4.6
ExE
ExS
ExT
ExW
ExE
4.0 9007
ExT
4.7
NOT FOR CONSTRUCTION 4.7
4.1
4.1
245
509171
4.555
---- ---- ---- ---- ---- North Point Approved Project Address Title
---- ---- ---- ---- ----
E. WHITMORE
12 GYMPIE STREET, TEWANTIN SEDIMENT AND EROSION SITE STABILISATION PLAN
N
---- ---- ---- ---- ---- 31423 11.11.25
---- ---- ---- ---- ---- For and on behalf of RECOR Pty Ltd.
---- ---- ---- ---- ---- Scale ENGINEERING & PROJECT SERVICES Client Details Project Name Sheet Size
5 0 5 10 SUNSHINE COAST | BRISBANE
B 17.02.26 ISSUED FOR OPW APPROVAL CS EW SCALE (metres) www.recor.au | ABN 89 647 469 707 NOVATO GROUP 7 LOT RESIDENTIAL SUBDIVISION A1
1 : 250 (FULL SIZE) Project Number Drawing Number Revision
A 11.11.25 ISSUED FOR OPW APPROVAL AY EW COPYRIGHT © This drawing is subject to copyright in accordance with the agreement between RECOR Pty Ltd and RECOR's
client. This drawing shall only be used for this specific project. This drawing shall not be used for construction until marked as
Rev Date Revision Description Drawn Check DO NOT SCALE, IF IN DOUBT ASK 'Issued For Construction' in the revision description. P0198-25-001 C120 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.