Council archive · source document
Decision Notice [As Published] · 142007.191
Officer: Jack Lewis
Direct Telephone: (07) 5449 5183
Response Address: Locked Bag 72
Sunshine Coast Mail Centre QLD 4560
Email: [email protected]
Our Reference: 2007/191
Your Reference:
30 April 2010
George Frederick Felix Simari
CARE Suncoast Building Approvals
PO Box 1054
MAROOCHYDORE QLD 4558
Dear Sir
Decision Notice
Integrated Planning Act 1997
I refer to your application and advise that on 29 April 2010 Council decided to approve the
application in full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2007/191
Street address: 39 Duke Street, Sunshine Beach
Real property description: Lot 387 RP 48112
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Operational Works - Landscaping, Car Parking & Access Stormwater
Drainage, Earthworks and Erosion & Sediment Controls
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
Approved Plans
1. The development shall be carried out in accordance with the approved plans listed below,
except as amended by the conditions.
Page 1 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
2007/191
Plan No. Rev. Plan Name Date
16.0304.1 - March 2004
Driveway, Site Plan by Andrew McKellar
1202-1 A 10 August 2004
Hydraulics by Construction Hydraulics
01RD December 2009
Landscape Plan and Schedule- Redwoods
Landscaping
General
2. These works are also to be in compliance with the relevant conditions of Development Permit
No. 23247 DA.
3. Council standards shall apply to these works unless otherwise modified herein.
Construction
4. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
5. Council’s Construction Technical Officer (phone 0439 717 952) shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of those works.
6. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability documentation.
7. Prior to the pre start meeting, the principal contractor must be provided with a copy of
Council’s signed approved drawings and conditions by the applicant.
8. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all
inspections with Council’s Construction Technical Officer or nominated staff. Council’s
Construction Technical Officer shall provide an inspection form for signing-off by the Engineer
at appropriate stages of construction during on-site meetings. The Construction Technical
Officer will also sign the form at each stage when requested conditions have been satisfied.
9. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project (This person will be the contact for the project).
10. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture, etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify Council’s CEO and shall forthwith rectify the damage to that property or facility
at its cost and to the satisfaction of Council’s CEO.
All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
of the use.
In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the commencement of the use.
Page 2 of 10
Page 3
2007/191
11. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by Council’s CEO.
Carparking & Access
12. A Traffic Management Plan (TMP) for the development addressing all construction phases
shall be prepared by suitably qualified persons and submitted to Council for approval prior to
the pre start meeting. The TMP shall address, but not be limited to, all items listed below and
shall be flexible in that it addresses all stages of the development.
12.1. A single nominated access location to and from the site.
12.2. The plan should detail the routing of trucks to and from the site.
12.3. Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
12.4. Provision of safe cycle and pedestrian movements in the vicinity of the development
on Duke Street.
12.5. No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
12.6. Provision of signage and traffic controllers in accordance with Manual of Uniform
Traffic Control Devices and the Transport Infrastructure (Roads) Act.
12.7. Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
13. All signage, including that for safety during construction, shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
14. Safe pedestrian access on Duke Street in the vicinity of the development shall be maintained
at all times. If footpath / road closures are necessary to carry out construction works, Council’s
Construction Technical Officer (phone 0439 717 952) must be notified prior to the proposed
closure.
Frontage Works
15. A 1.2 metre wide concrete footpath shall be constructed across the full frontage of the
development. The footpath shall have a maximum crossfall of 2.5%. The alignment shall be
confirmed on site with Council’s Construction Technical Officer. The footpath shall have a slip
resistant surface and the expansion joints shall be “saw cut”, not trowel jointed.
Stormwater Drainage
16. Roof and surface runoff connection to Council’s drainage system shall be as shown on
drawing 1202-1A by Construction Hydraulics.
Erosion & Sediment Control
17. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
18. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved, it is the site Supervising Engineer who is responsible for
ensuring that the sediment and erosion control measures have:
18.1. Been duly designed and constructed in accordance with “best practise” methods;
Page 3 of 10
Page 4
2007/191
18.2. Been revised to address the issues raised by any changes to the projected
construction schedule and/or methods;
18.3. Been revised to address any predicted rainfall events; and
18.4. Achieved the desired environmental outcomes.
Council may request further controls to be installed should approved measures be inefficient.
Water & Sewer
19. Reticulated water supply and sewerage must be provided to the development.
20. Separate 25mm PE water services must be installed to a common lot boundary with
independent meters installed outside the boundary of the lot in accordance with Sunshine
Coast Water standard drawing SCW 361. Meters must be “Elster” PSM 50100/39 (dual
check).
21. A 100mm conduit, if required, must be provided under Duke Street in accordance with
Sunshine Coast Water Standard Drawing SCW 355 and 360 for the 25mm water services.
22. Buildings, basements and other structures must maintain a minimum clearance of 1.5 metres
from Council sewer mains, and 1.0 metre from the sewer inspection opening.
23. Stormwater retention systems, gross pollutant traps and in-ground water storage tanks must
maintain a minimum clearance of 1.5 metres from Council sewerage infrastructure.
24. A 3.0 metre wide easement must be provided over all Council sewers located in private
property.
25. Landscape planting within 1.5 metres of Council sewerage infrastructure must be Council
approved varieties and low growing when mature.
26. Construction works undertaken in the vicinity of Council water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs associated
with repair, replacement or alteration of infrastructure must be met by the applicant.
Landscaping
27. The site is to be landscaped in accordance with The Noosa Plan Landscaping Code and
Planning Scheme Policy PSP3 on Landscaping Plants and Guidelines.
28. The applicant must submit an amended Landscape Plan and planting schedule to Council’s
Co-ordinator of Environment and Landscape Unit for approval prior to the pre-start meeting.
The landscape plan shall be generally in accordance with Drawing Number 01RD by
Redwoods Landscaping and amended on December 2009 and include the following
amendments:-
28.1. Archontophoenix Alexandra, Agapanthis African, Ixora chinensis, Liriope Evergreen
Giant and Duranta Sheenas Gold must be replaced with any similar sized species
listed in Table 6.1, 6.2 and 6.3 of The Noosa Plan Planning Scheme Policy 03 –
Landscaping Plans and Guidelines.
28.2. Syzygium species along the North-Western property boundary are not permitted in the
vicinity of the sewer line and must be replaced with either of the following species:
28.2.1. Callistemon sp (wildfire or Eureka variety); and/or
28.2.2. Leptospermum petersonii
28.3. The density of plantings along the rear and side property boundaries must be
increased using plant species only from the approved amended planting schedule and
to comply achieve the following separation distances:
28.3.1. Trees = 5m separation
Page 4 of 10
Page 5
2007/191
28.3.2. Larger shrubs = 2m separation
28.3.3. Groundcovers = 0.5 - 1.0m separation
29. To ensure pedestrian safety between vehicles exiting the site and pedestrians on the footpath,
any vegetation within the 2.0m by 2.5m pedestrian sight triangle adjacent to the intersection of
the driveway and front property boundary must not exceed a maximum growth height of 0.6m
pursuant to AS 2890.1, section 3.2.4.
30. Plantings must not interfere with the optic fibre cable networks located within the Duke Street
road reserve.
31. Grass within the Duke Street road reserve must be couch or buffalo turf, free of weeds.
32. Any street tree species planted within the Duke Street road reserve must be consistent with
the character of Duke Street and be selected from Table 6.1 of the Noosa Plan Planning
Scheme Policy 03 Landscaping Plants and Guidelines.
33. The irrigation system must be designed and installed in accordance with the Efficient Irrigation
for Water Conservation Guideline as referred to in Part 8 of the Queensland Plumbing and
Wastewater Code. In particular, the irrigation system must include an automated timer, used
with a soil moisture sensor or rain sensor to prevent the system operating during rain or where
the soil already holds adequate moisture to sustain plant growth.
34. The landscape construction is to be implemented in accordance with the approved amended
landscape plan, amended approved planting schedule and horticultural industry best
practices.
35. All trees 45 litre and greater must be securely staked and tied to assist their growth during the
12 month establishment period.
36. Construction works must not negatively affect the health of any tree identified for retention. In
order to achieve compliance with this condition, construction works under the drip-line of any
trees identified for retention must be undertaken in accordance with the recommendations of a
suitably qualified arborist. Evidence of instructions provided by an arborist must be provided to
Council upon request by Councils Environment and Landscape Co-ordinator and prior to
release of performance bonds.
37. All landscaping treatment shall not unduly restrict or prevent access to service meters within
the site.
38. All trees must be located a minimum of 1 metre from all services to prevent root/service
conflict and to provide future ease of maintenance requirements.
39. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of
cover and be visible at all times to ensure prompt access in case of emergency.
40. The Applicant must apply to council for a pre-start meeting a minimum of 5 working days prior
to the desired meeting date. The project Arborist must be in attendance with the contractor to
coordinate tree protection measures.
Security Bond
41. A site control and compliance bond for the MCU and Operational Works conditions of $10,000
is to be submitted to Council prior to the pre-start meeting. The pre-start meeting will only be
held once Council's Construction Technical Officer has confirmation that Council has received
the bond monies.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
Page 5 of 10
Page 6
2007/191
Relevant Period
42. This Development Permit lapses if the development has not happened by 29 April 2012,
unless application to extend the currency is approved by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Not applicable
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
16.0304.1 - March 2004
Driveway, Site Plan by Andrew
McKellar
1202-1 A 10 August 2004
Hydraulics by Construction Hydraulics
01RD December 2009
Landscape Plan and Schedule-
Redwoods Landscaping
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. Should any changes or modifications to the approved plans be required as a result of
construction constraints, a “Request to change an existing approval” (Form 2 Development
Application) under the Integrated Planning Act 1997 must be made. Amended plans clearly
indicating the changes must be lodged with this application along with the appropriate fees.
2. Connection to Council live water mains and the Council live sewer system must be undertaken
by Council at the applicants cost.
3. Water features located within 1.5 metres of a Council sewer must be easily removable without
damage to the structure. No pumping or electrical equipment may be located within 1.5 metres
of the sewer.
4. Where the Council sewer traverses parallel to the property boundary the sewer easement can
extend from property boundary to a location 1.5 metres from the barrel of the sewer pipe.
5. The level of the existing sewer manholes and sewerage inspection opening must be adjusted
to suit the proposed finished surface levels. Work must be undertaken by Sunshine Coast
Water at the applicants cost.
6. A Trade Waste permit is required prior to any stormwater, groundwater or sump pump
discharge into Council’s sewerage system.
Page 6 of 10
Page 7
2007/191
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable.
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable.
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Not applicable
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Not applicable.
12 SUBMISSIONS
Not applicable.
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable.
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
Page 7 of 10
Page 8
2007/191
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Denis Wallace
Senior Development Planner
Enc: Appeal Rights
Approved Plans
Page 8 of 10
Page 9
2007/191
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated
(6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to for the application are not available against the part of
development applications the approval that represents the concurrence agency’s
response for the code.
Appeals by applicants
Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following- 4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application
application; if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code
under section 3.1.6;1 (b) the advice agency told the applicant and the
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must submitter.
be started within 20 business days (the “applicant’s Appeals for matters arising after approval given
appeal period”) after the day the decision notice or (co-respondents)
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be development application, a person to whom any of the
started at any time after the last day a decision on the following notices have been given may appeal to the
matter should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application extension of the relevant period for an approval;
may appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including minor change to an approval.
any conditions (or lack of conditions) or other (2) The appeal must be started within 20 business
provisions of the approval; or days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day approval resulted from a development application
the decision notice or negotiated decision notice is (superseded planning scheme) that was assessed as
given to the submitter. if it were an application under a superseded planning
scheme.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the (4) Also, a person who has made a request
decision. mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(4) If an application involves both impact
assessment and code assessment, appeal rights for (5) An appeal under subsection (4) may be started
submitters are available only for the part of the at any time after the last day the decision on the
application involving impact assessment. matter should have been made.
(5) If an application is processed under section Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the Appeals for matters arising after approval given
application are available only for the aspects of the (no co-respondents)
development that would have required public
notification under the repealed Act. 4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
a. (a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 9 of 10
Page 10
2007/191
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development relevant period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision be started within 20 business days (the “applicant’s
is given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request. started at any time after the last day a decision on the
(4) An appeal under subsection (3) may be matter should have been made.
started at any time after the last day the decision on The Registrar for the Building and Development
the matter should have been made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
For Infrastructure Charges Only
decision made on an application to change the 4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under charges
section 2.19(3)or section 4.4 of the repealed Act may (1) This section applies to a person who has been
appeal to the court against- given, and is dissatisfied with, an infrastructure
(a) the decision; or charges notice or a regulated State infrastructure
(b) a deemed refusal of the application. charges notice.
(2) An appeal under subsection (1)(a) must be (2) The person may appeal to the court against the
started within 20 business days after the day notice of notice.
the decision is to be given to the person. (3) The appeal must be started within 20 business
(3) An appeal under subsection (1)(b) may be days after-
started at any time after the last day a decision on the (a) if the notice is given because of a development
matter should have been made. approval or master plan approval-the day the
Appeals against local laws applicant is given notice of the decision about the
approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions (b) otherwise-the day the notice is given to the
applied under a local law about the use of premises or person.
the erection of a building or other structure permitted (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court (a) whether a charge in the notice is so
against the decision or the conditions applied. unreasonable that no reasonable relevant local
(2) The appeal must be started within 20 business government, State infrastructure provider or
days after the day notice of the decision is given to the coordinating agency could have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the appeal under this section can not be about the
Integrated Planning Act 1997 as follows: methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
a.
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 10 of 10