Decision Notice [As Published] · 142007.191
2007/191
Plan No. Rev. Plan Name Date
16.0304.1 - March 2004
Driveway, Site Plan by Andrew McKellar
1202-1 A 10 August 2004
Hydraulics by Construction Hydraulics
01RD December 2009
Landscape Plan and Schedule- Redwoods
Landscaping
General
2. These works are also to be in compliance with the relevant conditions of Development Permit
No. 23247 DA.
3. Council standards shall apply to these works unless otherwise modified herein.
Construction
4. Notwithstanding that Council has checked the plans with due care, where it is found during
construction that variations from Council's standards exist, then Council standards shall apply.
5. Council’s Construction Technical Officer (phone 0439 717 952) shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of those works.
6. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability documentation.
7. Prior to the pre start meeting, the principal contractor must be provided with a copy of
Council’s signed approved drawings and conditions by the applicant.
8. The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all
inspections with Council’s Construction Technical Officer or nominated staff. Council’s
Construction Technical Officer shall provide an inspection form for signing-off by the Engineer
at appropriate stages of construction during on-site meetings. The Construction Technical
Officer will also sign the form at each stage when requested conditions have been satisfied.
9. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project (This person will be the contact for the project).
10. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture, etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify Council’s CEO and shall forthwith rectify the damage to that property or facility
at its cost and to the satisfaction of Council’s CEO.
All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement
of the use.
In the case of any emergency, Council shall be entitled to rectify such damage at the cost of
the Applicant, such cost being paid prior to the commencement of the use.
Page 2 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.