11. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by Council’s CEO.
Carparking & Access
12. A Traffic Management Plan (TMP) for the development addressing all construction phases
shall be prepared by suitably qualified persons and submitted to Council for approval prior to
the pre start meeting. The TMP shall address, but not be limited to, all items listed below and
shall be flexible in that it addresses all stages of the development.
12.1. A single nominated access location to and from the site.
12.2. The plan should detail the routing of trucks to and from the site.
12.3. Provision of onsite parking for personnel working on this development, as there is
limited parking available in adjacent streets.
12.4. Provision of safe cycle and pedestrian movements in the vicinity of the development
on Duke Street.
12.5. No queuing of trucks is permitted on residential streets, especially prior to 7.00am.
Further parked trucks must have engines turned off.
12.6. Provision of signage and traffic controllers in accordance with Manual of Uniform
Traffic Control Devices and the Transport Infrastructure (Roads) Act.
12.7. Provide an indication where the surplus spoil is to be transported to, and/or source of
imported fill material.
13. All signage, including that for safety during construction, shall be in accordance with the
Manual of Uniform Traffic Control Devices and Transport Infrastructure (Roads) Act.
14. Safe pedestrian access on Duke Street in the vicinity of the development shall be maintained
at all times. If footpath / road closures are necessary to carry out construction works, Council’s
Construction Technical Officer (phone 0439 717 952) must be notified prior to the proposed
closure.
Frontage Works
15. A 1.2 metre wide concrete footpath shall be constructed across the full frontage of the
development. The footpath shall have a maximum crossfall of 2.5%. The alignment shall be
confirmed on site with Council’s Construction Technical Officer. The footpath shall have a slip
resistant surface and the expansion joints shall be “saw cut”, not trowel jointed.
Stormwater Drainage
16. Roof and surface runoff connection to Council’s drainage system shall be as shown on
drawing 1202-1A by Construction Hydraulics.
Erosion & Sediment Control
17. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
18. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved, it is the site Supervising Engineer who is responsible for
ensuring that the sediment and erosion control measures have:
18.1. Been duly designed and constructed in accordance with “best practise” methods;
Page 3 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 66 KB (small file)
- File type
No other editions are linked here.