Performance outcomes Acceptable outcomes Comments
burden, disaster management response or evacuation of people and ensure sufficient There will be no changes to the existing
recovery capacity or capabilities. warning time for the nature of the use. buildings or roads. There will be no change to
disaster management response.
AO7.2 Complies
Development does not:
a) increase the number of people
calculated to be at risk from flooding;
b) increase the number of people likely to
need evacuation;
c) shorten flood warning times for other
uses in the floodplain; or
d) impact on the ability of traffic to use
evacuation routes, or unreasonably
increase traffic volumes on
evacuation routes.
AO7.3 Not Applicable
Materials stored on site: Not required.
a) are readily able to be moved in a flood
event to a flood free area; or
b) are contained in order to minimise
movement in times of flood.
Editor's Note— Businesses should ensure
that necessary emergency and continuity
plans are in place to account for the potential
need to evacuate personnel and to relocate
property prior to a flood event.
Essential network infrastructure
PO8 AO8 Not Applicable
Essential network infrastructure maintains Essential network infrastructure that is likely to
7 & 55 Happy Jack Creek Rd, Ridgewood Flood Hazard Overlay Code – Noose Shire Planning Scheme 2020 Page 5
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App C - Code Responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.