Council archive · source document
App C - Code Responses · RAL23/0009
Performance outcomes Acceptable outcomes Comments
effective function during and immediately after fail to function or may result in contamination Existing infrastructure will be retained.
flood and storm tide inundation events. when inundated by flood water (e.g. water
supply pipeline air valves and the like) is
located above the DFE level (or where
the DFE has not been modelled for the area,
above the highest recorded flood level for the
area).
Essential community infrastructure
PO9 AO9.1 Not Applicable
Essential community infrastructure is able to Essential community infrastructure is sited The proposal does not involve essential
function effectively during and immediately after and constructed to ensure that flood levels community infrastructure.
flood events. comply with flood immunity requirements
specified in Table 8.2.6.4.
AO9.2 Not Applicable
Essential community infrastructure which is
located below the specified flood immunity
requirements:
a) is designed and constructed to
function effectively during and
immediately after the recommended
flood level event; and
b) has direct access to low hazard
evacuation routes or an emergency
rescue area above the PMF, if it is
for emergency services (including
emergency shelters, police facilities,
hospitals and associated facilities).
Earthworks
7 & 55 Happy Jack Creek Rd, Ridgewood Flood Hazard Overlay Code – Noose Shire Planning Scheme 2020 Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App C - Code Responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 354 KB (small file)
- File type
No other editions are linked here.