21.   A temporary crossing must be provided to protect road reserve infrastructure including kerb
      and channel.
22.   Any damage to footpaths, street plantings, kerb and channel or roadways at the removal
      site, the relocation site or between the sites must be repaired or reinstated to at least pre-
      existing conditions.
23.   All disturbed areas must be revegetated or otherwise stabilised at the completion of the
      works. Disturbed areas are revegetated using species identified in PSP3 – Landscaping
      Plants and Guidelines.
24.   The transportation of all materials to and from the site must be undertaken in a manner such
      that no particle matter escapes onto a public road. All vehicles carrying out materials either
      to or from the site shall be covered to prevent materials, including dust, being windblown
      from the vehicle.
25.   A Waste Management Plan (demolition) shall be submitted for Building Works approval. The
      waste Management Plan (demolition) is required to be submitted in accordance with
      Planning Scheme Policy 11- Waste Management Plans. The Plan shall contain the following
      information:-

               A waste management table as indicated below is to be completed showing how
                waste material is to be segregated – recycled – reused or disposed.
           MATERIALS ON-SITE                        DESTINATION

                                                    Re-use and Recycling            Disposal

           Expected waste materials   Estimated     On-site       *specify   Off-site   *specify    *Specify contractor
                                      volume (m³)   proposed   reuse or      contractor       &     & landfill site
                                                    onsite       recycling   recycling outlet
                                                    methods




           Excavation material

           Green waste

           Bricks

           Concrete

           Timber – please specify

           Plasterboard

           Metals – please specify

           Asbestos

           Other – please specify



          NOTE: Details of site area to be used for onsite separation, treatment and storage
          (including weather protection) shall be provided on the plan drawings accompanying your
          application.

          The purpose of the Waste Management Plan is to facilitate the segregation of waste for the
          effective reuse and recycling of such materials. Additionally, Council rewards those who
          segregate waste by significantly reducing disposal fees at the landfill with some items free.
          Higher gate fees are charged for loads of mixed waste.

                                                                                            Page 4 of 10

Used in these records

About this file

File size
69 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

SUPERSEDED Decision Notice - 010.2009.00000879.001 [As Published].pdf · 69 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.