Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

Ordinary minutes, 21 August 2025

of 17

Text shows just the words. Original shows the document exactly as it was published.

                         MINUTES


              Ordinary Meeting

             Thursday, 21 August 2025

                                 5:00 PM
         Kin Kin Memorial School of Arts Hall, Main St Kin Kin




Cr Frank Wilkie (Chair), Karen Finzel, Amelia Lorentson, Jessica Phillips, Brian
Stockwell, Tom Wegener, Nicola Wilson




                      “Noosa Shire – different by nature”
Full text of the other 16 pages

Page 2

ORDINARY MEETING MINUTES                                                       21 AUGUST 2025



1     DECLARATION OF OPENING
      The meeting was declared open at 5.00pm.



2     ACKNOWLEDGEMENT OF COUNTRY
      Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters
      of the Noosa area, the Kabi Kabi people, and pays respect to their Elders, past, present and
      emerging.

3     ATTENDANCE & APOLOGIES
      COUNCILLORS
      Cr Frank Wilkie (Chair)
      Cr Karen Finzel
      Cr Jessica Phillips
      Cr Amelia Lorentson
      Cr Brian Stockwell
      Cr Tom Wegener
      Cr Nicola Wilson


      EXECUTIVE
      Chief Executive Officer Larry Sengstock
      Director Community Services Kerri Contini
      Acting Director Corporate Services Margaret Gatt
      Director Development & Regulation Richard MacGillivray
      Director Strategy and Environment Kim Rawlings
      Director Infrastructure Services Shaun Walsh


      APOLOGIES
      Nil.


4     CONFIRMATION OF MINUTES

4.1   CONFIRMATION OF MINUTES - ORDINARY MEETING DATED 17 JULY 2025
      Council Resolution
      Moved:            Cr Karen Finzel
      Seconded:         Cr Amelia Lorentson
      That the Minutes of the Ordinary Meeting held on 17 July 2025 be received and
      confirmed.
      Carried.
                        Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr Amelia
      For:              Lorentson, Cr Brian Stockwell, Cr Tom Wegener, Cr Nicola
                        Wilson
      Against:          None

Page 3

ORDINARY MEETING MINUTES                                                        21 AUGUST 2025


4.2   CONFIRMATION OF MINUTES - SPECIAL MEETING DATED 4 AUGUST 2025
      Council Resolution
      Moved:            Cr Karen Finzel
      Seconded:         Cr Tom Wegener
      That the Minutes of the Special Meeting held on 4 August 2025 be received and confirmed.
      Carried.
                        Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr Amelia
      For:              Lorentson, Cr Brian Stockwell, Cr Tom Wegener, Cr Nicola
                        Wilson
      Against:          None



5     PETITIONS
      1. PETITION - PUBLIC SAFETY IN SUNRISE BEACH
      Refer to Attachment 1 to the Ordinary Minutes

      Council Resolution
      Moved:            Cr Amelia Lorentson
      Seconded:         Cr Jessica Phillips
      That the petition with 18 signatories submitted by Geoff Mallinson, requesting that Council
      address safety issues in Tingira Cres & Sobraon St Sunrise Beach, be received and
      referred to the Chief Executive Officer to determine appropriate action.
      Carried.
                         Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr Amelia
      For:
                         Lorentson, Cr Brian Stockwell, Cr Tom Wegener, Cr Nicola Wilson
      Against:           None




      2. PETITION - REMOVE BASKETBALL HOOP FROM CHARLES BENNETT PARK
      Refer to Attachment 2 to the Ordinary Minutes

      Council Resolution
      Moved:            Cr Amelia Lorentson
      Seconded:         Cr Karen Finzel
      That the petition with 10 signatories submitted by Katrina Bodycote, requesting that Council
      remove the basketball hoop from Charles Bennett Park, be received and referred to the
      Chief Executive Officer to determine appropriate action.
      Carried.
                         Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr Amelia
      For:
                         Lorentson, Cr Brian Stockwell, Cr Tom Wegener, Cr Nicola Wilson
      Against:           None

Page 4

ORDINARY MEETING MINUTES                                                      21 AUGUST 2025


      3. PETITION - REMOVE 2HR PARKING RESTRICTIONS & INTRODUCE PARKING
      PERMITS FOR BUSINESSES AT TEWANTIN PLAZA
      Refer to Attachment 3 to the Ordinary Minutes

      Council Resolution
      Moved:           Cr Amelia Lorentson
      Seconded:        Cr Jessica Phillips
      That the petition with 32 signatories submitted by Tewantin Plaza Businesses, requesting
      that Council remove parking restrictions & introduce business parking permits at Tewantin
      Plaza, be received and referred to the Chief Executive Officer to determine appropriate
      action.
      Carried.
                         Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr Amelia
      For:
                         Lorentson, Cr Brian Stockwell, Cr Tom Wegener, Cr Nicola Wilson
      Against:           None


6.    PRESENTATIONS
      Nil.



7.    DEPUTATIONS

7.1   Topic: Access issues to Eastern Branch Creek Rd,
      Applicant: James Porter
      Speakers: James Porter




7.2   Topic: Cooroy Mountain Rd
      Applicant: Andrew Taylor on behalf of the residents of Cooroy Mountain Rd.
      Speakers: Andrew Taylor, Alan Deering, Sarah Carter

Page 5

ORDINARY MEETING MINUTES                                                             21 AUGUST 2025


8.      PUBLIC QUESTION TIME

8.
   HELEN NUGENT
1
     QUESTION 1
     What is the timeline for remediation works to restore and rehabilitate the Noosa Daintree Estate,
     including but not contained to:- removal of obnoxious weed, tree pruning, fallen debris, mowing
     and slashing of causeway. In addition, an ongoing maintenance and management plan for the
     estate land and assets.

     Response provided by Director of Infrastructure, Shaun Walsh
     In the next 2 months we have scheduled the following works in preparation for the traditional
     storm season:
          cleaning out the culvert on Golf links drive and the adjacent in the National Park – under
             the conditions of the permit issued by National Parks and Wildlife Service
          Tree pruning at various locations
          Scheduled mowing
     We are also scoping the following additional initiatives:
         Engineered rehabilitation of the open drain to encourage water flow and reduced ponding
           of water in areas – this will take time to survey and design and come up with an effective
           solution
         Additional street signage to support children safety in Homestead Dr.
     Council staff have commenced preparation of site-specific maintenance Plan for Daintree Estate
     to respond to its specific drainage characteristics, inclusive of a more proactive inspection regime
     in order to schedule any reactive maintenance. The preparation of an exclusive and site-specific
     maintenance plan is an initiative in response to Councils desire to maximise the drain
     performance to the maximum extent possible during rain events.


     QUESTION 2
     Has or did Noosa Council apply to the relevant department to revoke the permits required for
     ongoing maintenance from Noosa Daintree Estate through to McKinnon Drive.

     Response provided by Director of Infrastructure, Shaun Walsh
     Council currently operates under a short-term permit from Queensland National Parks and
     Wildlife Service to undertake maintenance works in the open drain area adjacent to Golf Course
     Drive but within the adjacent Harry Spring Conservation.
     Council has submitted an enduring revocation request to Queenland National Parks and Wildlife
     Service to extract a potion of Harry Springs Conservation Park to allow drain maintenance works
     in this location to more efficiently delivery future works. This revocation only applies to the
     existing cleared area adjacent to Golf Course Drive and as envisaged by the original stormwater
     system design. To be clear it does not extend to include the natural creek corridor through the
     Conservation Park through to McKinnon Drive. It is important to note that the Daintree Estate’s
     stormwater channel is designed to hold stormwater during rain events, and inundation of the
     parkland and roadway and is a normal and expected function of this system. The topography
     downstream of the site is very gentle and low lying and the slow drainage characteristics perform
     as expected as part of the natural Wooroi Creek and adjacent Noosa River system.

Page 6

ORDINARY MEETING MINUTES                                                        21 AUGUST 2025


8.
   NICK COOKE
2
  Question 1
  To assure Hinterland residents that Council will effectively enforce the Kin Kin Quarry
  Management Plan, can council outline the specific actions it will take to address the enforcement
  constraints identified through the failed court action Noosa Council v Cordwell Resources
  (155/21) and the decision not to pursue over $160,000 in fines issued to the Kin Kin Quarry
  operator?

  Response provided by Director Development & Regulation, Richard MacGillivray
  Thank you for your question regarding Council’s enforcement of the Kin Kin Quarry Management
  Plan (QMP). Council understands the community’s concerns and remains committed to ensuring
  compliance with the approved conditions, including the QMP.
  In response to the court proceeding, it is acknowledged that Council was successful in part of
  the proceedings with an enforcement order being granted with respect to covered loads. It is also
  relevant to highlight that Council has also successfully defended an appeal against an
  Enforcement Notice relating to fixed plant infrastructure in the Planning & Environment Court,
  with obligations continuing to be pursued. Regarding historical infringement notices that were
  appealed, these were not pursued through the Magistrates Court as Council focused its legal
  efforts on broader compliance issues in the Planning and Environment Court. Due to statutory
  limitations, these past infringements can no longer be pursued. However, Council remains
  committed to considering all available enforcement options should any clear breach be identified
  and validated moving forward. In terms of ongoing compliance monitoring regular inspections
  are being conducted at varied times to assess quarry operations in line with council approval
  requirements. Council has worked with contractors to introduce automated data capture
  systems, reducing reliance on manual monitoring and improving the consistency and reliability
  of compliance data, this data is supported by photographic and video evidence. Ongoing review
  of this data demonstrates that the quarry operations are generally in accordance with their
  obligations under the QMP regarding vehicle queuing and departure intervals. Council also
  working closely with the State Department of Environment, Science and Innovation (DESI) who
  regulate the Quarry operations through an Environmental Authority.




  Question 2
  Can Council continue to assure the Hinterland community, that the council will not extend the
  Kin Kin Quarry permit beyond its end-of-life 2033 sunset clause, which marks 46 years since the
  original approval?

  Response provided by Director Development & Regulation, Richard MacGillivray
  Thank you for your question regarding the future of the Kin Kin Quarry and Council’s position on
  the 2033 sunset clause. Council acknowledges the strong community interest in ensuring that
  the quarry operations do not extend beyond the current approval period. If an application is
  made to extend the sunset clause Council will assess the application thoroughly, with full
  consideration of community concerns, environmental impacts, and planning requirements. It is
  important to acknowledge that the site is subject to a State imposed Key Resource Area (KRA)
  overlay. If no application is made to extend the currency period, the current sunset clause
  remains in place and is enforceable. We appreciate the community’s ongoing interest on this
  matter and will continue to provide regular updates in due course.

Page 7

ORDINARY MEETING MINUTES                                                        21 AUGUST 2025


8.
   HAYLEY HASS
3
  Question 1
  Could Council please clarify whether the Draft Destination Management Plan still intends to
  investigate/implement the ‘Transformational Scenarios’ outlined in the Discussion Paper,
  including pedestrian-only zones in Hastings Street and Gympie Terrace during peak times,
  access to Noosa National Park by free bus only during peak times, restricted access and booking
  systems for Noosa’s iconic landscapes, ban single use coffee cups on Hasting St and Gympie
  Tce and mandates on iconic events and all tourism and service providers to be zero waste and
  zero-emissions?

  Response provided by Director Strategy & Environment, Kim Rawlings
  The transformational scenarios presented in the Phase 1 Destination Management Discussion
  Paper were intended as thought-starters to encourage community dialogue around potential
  solutions. A detailed analysis of the Phase 1 feedback revealed initial community interest in
  several of these ideas. As a result, some have been included in the Phase 2 Draft Destination
  Management Plan (DMP) for further consideration. The Phase 2 engagement process is
  designed to assess the level of community support for some of these ideas and others,
  recognising that Noosa’s population continues to evolve and that some proposals may have both
  positive and negative implications depending on your perspective. Council is therefore using
  this comprehensive second phase of engagement which runs for 6 weeks until 14 September to
  seek clear feedback and input around levels of support from our community before finalising the
  DMP and advancing these actions.




  Question 2
  Does Council recognise that the proposed vehicle, parking and access restrictions in Noosa, as
  floated in the Destination Management Plan, will severely impact car dependent Noosa
  Hinterland residents, but also local businesses who face a reduction in visitor traffic?

  Response provided by Director Strategy & Environment, Kim Rawlings
  As outlined above, the Phase 2 engagement process is intended to gauge the level of community
  support for the priority concepts identified by the community following Phase 1 Community
  Engagement on the Draft Destination Management Plan Discussion Paper. Council
  acknowledges that many of these ideas suggested by the community are interdependent. For
  example, the effectiveness of any potential changes to vehicle access or parking would rely on
  the availability of viable alternative transport optionsdash;such as smaller, more frequent bus
  services, including servicing the Hinterland. Such potential actions could enhance connectivity
  between Hinterland and coastal areas, benefiting not only residents who rely on private vehicles,
  but also those who are ageing, no longer wish to drive, or lack access to a vehicle and may
  currently experience isolation. Dynamic and regulated parking which is discussed in the Draft
  DMP can in fact improve carparking availability and turnover of vehicles. Council recognises that
  some ideas and concepts suggested by the community and reflected in the Draft DMP may be
  unacceptable to other community members, therefore Phase 2 community engagement is
  seeking input from everyone to assist Council to determine if there is clear support or otherwise
  from the community on all actions and tasks within the Draft DMP.

Page 8

ORDINARY MEETING MINUTES                                                          21 AUGUST 2025


8.
   PAT SPICER
4
  QUESTION 1
  How is the tender cost being funded for remediation and subdivision for 62/64 Lake Macdonald
  Drive, Cooroy?

  Response provided by Director Strategy & Environment, Kim Rawlings
  As part of the Council resolution on 20 January 2025, Council voted to “Support advancing the
  subdivision and remediation works subject to securing a loan facility, whilst continuing to actively
  pursue grant funding opportunities". Grant applications have been submitted to relevant State
  and Federal bodies with responses from these bodies yet to be finalised. Depending on the
  outcome of these grant applications, an application may be made to the Queensland Treasury
  Corporation (QTC) for a loan facility to fund the balance of the project costs.




  QUESTION 2 Thank you for the comprehensive list of land, other than 62/64 Lake Macdonald
  Drive owned by Noosa Council in Cooroy at the July meeting. Could you please add to this
  list, so it is an exhaustive list, including land labelled as “lazy land” as 62 (now 62/64) Lake
  Macdonald Drive Cooroy was labelled “lazy land”?
  Response provided by Director Strategy & Environment, Kim Rawlings
  Council does not label land 'lazy' as all land is allocated for a purpose. As stated in the last
  question Public Question on 17 July 2025, Council owned land is mostly for parks, environmental
  protection and land for community facilities such as libraries and grounds sporting activities with
  much land constrained by natural hazards. The land in bold in the following table has been added
  since the last meeting in July. There are some Park areas in Cooroy that are owned by the State
  of Queensland and not by Council.




  Meeting was adjourned at 5.45pm.

  Meeting recommenced at 5.56pm.

Page 9

ORDINARY MEETING MINUTES                                                         21 AUGUST 2025


9     MAYORAL MINUTES
      Nil.

10    NOTIFIED MOTIONS
      Nil.

11.   CONSIDERATION OF COMMITTEE RECOMMENDATIONS

11.1 PLANNING & ENVIRONMENT COMMITTEE RECOMMENDATIONS DATED 12
     AUGUST 2025


11.1.1.           UPDATE TO INFRASTRUCTURE CHARGES RESOLUTION

                  That Council note the report by the Infrastructure Assessment Coordinator to the
                  Planning & Environment Committee Meeting dated 12 August 2025 and adopt the
                  “Noosa Shire Council Charges Resolution (No.9) 2025” provided as Attachment
                  2 to the report and take effect on 21 August 2025 replacing the previous “Noosa
                  Shire Council Charges Resolution (No.8) 2024”.


11.1.2.           SHORT STAY LETTING AND HOME HOSTED ACCOMMODATION LOCAL
                  LAW – OPERATIONAL REVIEW 2024/2025

                  That Council note the report by the Coordinator Short Stay to the Planning &
                  Environment Committee Meeting dated 12 August 2025 and
                     A. Note the 2024/2025 Operational review of the Local Law has been
                         completed.
                     B. Agree to implement the actions identified within section 5 of this report in
                         accordance with the timeline detailed within Attachment 2.
                     C. Acknowledge and thank the stakeholders for their time and valuable
                         feedback.

11.1.3. 132003.220664.4 APPLICATION FOR A MINOR CHANGE TO AN EXISTING
        DEVELOPMENT APPROVAL FOR MATERIAL CHANGE OF USE - EXTENSION TO AN
        EXISTING SHOP - AT 12 MAPLE ST COOROY

          That Council note the report by the Senior Development Planner, to the Planning &
          Environment Committee Meeting dated 12 August 2025 regarding application
          132003.220664.4 for a Minor Change to an existing development approval for Material
          Change of Use – Extension to Existing Shop situated at 12 Maple Street, Cooroy and
          described as Lot 806 C 5602 and:
                  A. Approve the change.
                  B. Amend condition 1 to read as follows:
               Approved Plans
             1. Development authorised by this approval must be undertaken generally in
                accordance with the Approved Plans listed in the table below.

                Plan No.            Rev.   Plan/Document Name                            Date

                02-004-1            -      Prepared by TR & SL Roper Drafting            May 2006

Page 10

ORDINARY MEETING MINUTES                                                           21 AUGUST 2025



                101                   P2     Site Plan prepared by Hiller Studio            23.05.25

                103                   P3     Floor Plan Overall Proposed prepared by 23.05.25
                                             Hiller Studio

                312                   P4     External Elevations prepared by Hiller 23.05.25
                                             Studio

                313                   P4     External Elevations prepared by Hiller 23.05.25
                                             Studio

                C.     Include the following additional conditions:
               Façade Treatments
             17. Ground floor buildings that address the Apex car park must provide a minimum of
                 50% transparent glazing to shop fronts.
               Site Specific Conditions
             18. All hazardous materials and chemicals are to be stored at or above a minimum height
                 of 107.5 AHD.
               Stormwater Drainage
             19. Stormwater runoff from the development must be disposed of on-site without causing
                 scour or damage to the subject site or any adjoining property.
               Easements
             20. All works must be kept clear of any existing or proposed easements on the subject
                 land, unless agreed otherwise in writing by the Grantee.
               Damage to Services and Assets
             21. Any damage caused to existing services and assets as a result of the development
                 works must be repaired at no cost to the asset owner at the following times:
             22. where the damage would cause a hazard to pedestrian or vehicle safety,
                 immediately; or
             23. where otherwise, upon completion of the works associated with the development.
               Any repair work which proposes to alter the alignment or level of existing services and
               assets must first be referred to the relevant service authority for approval.
          Infrastructure Agreement
             22. The applicant must comply with the requirements of any Infrastructure Agreement
                 entered into with the Council with respect to the payment of car parking contributions
                 in relation to the proposed development.
             23. Agree to enter into an Infrastructure Agreement with the applicant that provides for
                 contributions in lieu of two (2) on site car parking space.
             24. Note the report is provided in accordance with Section 83(9) of the Planning Act
                 2016.



11.1.4.              132007.2446.05 - REQUEST FOR AN OTHER CHANGE TO AN EXISTING
                     DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE - VISITOR
                     ACCOMMODATION TYPE 4 CONVENTIONAL (VISITOR HOSTEL) TO
                     INCLUDE 11 ADDITIONAL BEDS AT 102 PACIFIC AVENUE SUNSHINE
                     BEACH

Page 11

ORDINARY MEETING MINUTES                                                  21 AUGUST 2025


            That Council note the report by the Senior Town planner to the Planning &
            Environment
            Committee Meeting dated 12 August 2025 regarding application 132007.244
            6.05 for an Other Change to a Development Permit for Material Change of
             Use for Visitor Accommodation Type 4 Conventional (Visitor Hostel) for an
            additional 11 beds at 102 Pacific Avenue, Sunshine Beach and

            A. Approve a change to the development approval.
            B. Include additional conditions 104 – 123 with amendments to condition 107 to
            read as follows:

            107 . Approved Plans
            Development undertaken in accordance with this approval must generally comply
            with the approved plans of development. The approved plans are listed in the
            following table unless otherwise amended by these conditions.




            C. Note the report is provided in accordance with Section 63(5) of the Planning
            Act 2016.
            D. Find the following matters relevant to the assessment and sufficient reason to
            approve the application:
               1. The proposed development will occur within a site already approved
                for visitor accommodation.
               2. A range of visitor accommodation is needed within the Shire. The r
               elatively minor increase in bed numbers for the site can be appropriately
               incorporated while managing impacts.
               3. The proposed development height complies with the Low Density resi
               dential zone maximum height of 8.0 metres above ground level.
               4. The proposed development setbacks to side and rear boundaries comply
               with the Low Density residential zone code.
               5. The proposed development on site car parking provision complies with
               Noosa plan 2020 Works code - Driveways and parking code.
               6. The applicant has prepared a site-specific acoustic assessment which has
               been peer reviewed. The peer review supports the recommendations of the
               acoustic assessment which have been included within the conditions of the
               approval.

11.1.5.     PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY – JUNE
            2025

            That Council note the report by the Development Assessment Manager to the
            Planning & Environment Committee Meeting on 12 August 2025 regarding
            applications that have been decided by delegated authority for June 2025 as per
            Attachment 1 to the Report.

Page 12

ORDINARY MEETING MINUTES                                                   21 AUGUST 2025


11.1.6.     POMONA PLACE PILOT EVALUATION REPORT

            That Council note the report by the Principal Strategic Planner to the Planning &
            Environment Committee dated 12 August 2025 regarding the evaluation of the
            Pomona Place Pilot and key learnings for any future Placemaking processes.



11.1.7.     PLANNING & ENVIRONMENT COMMITTEE RECOMMENDATIONS EN BLOC

             Council Resolution
             Moved:           Cr Karen Finzel
             Seconded:        Cr Tom Wegener
             That the Recommendations of the Planning and Environment Committee meeting
             dated 12 August 2025 be received and adopted except where dealt with by
             separate resolution.
             Carried.
                               Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr
             For:              Amelia Lorentson, Cr Brian Stockwell, Cr Tom Wegener,
                               Cr Nicola Wilson
             Against:          None

11.2 SERVICES & ORGANISATION COMMITTEE RECOMMENDATIONS DATED 12
     AUGUST 2025


11.2.8.     GO NOOSA REPORT

            That Services & Organisation Committee Agenda Item 7.1 be referred to the
            General Committee due to the significance of the issue.
11.2.9.     MAYOR'S ATTENDANCE - 2025 ASIA PACIFIC CITIES SUMMIT AND
            MAYORS’ FORUM VIA COUNCIL OF MAYORS SEQ (INTERNATIONAL
            TRAVEL)

            That Council
            A. Note the report by the Chief Executive Officer to the Services & Organisation
               Committee dated 12 August 2025 regarding the Mayor’s attendance and
               representation at 2025 Asia Pacific Cities Summit (2025APCS) and Mayors’
               Forum, Expo City Dubai) and site visits organised by the Council of Mayors;
            B. Approve the Mayor’s international travel for this trip (23 to 31 October 2025);
               and
            C. Note that the costs for the trip will be generally covered by Council of Mayors
               (SEQ).

11.2.10.    CAPITAL PROGRAM 2024/2025 DELIVERY STATUS

            That Council note the report by the Director Infrastructure Services to the
            Services & Organisation Committee Meeting dated 12 August 2025 providing an
            update on the delivery of the 2024/25 Capital Works Program as at 30 June
            2025.

Page 13

ORDINARY MEETING MINUTES                                                   21 AUGUST 2025




11.2.11.    NOOSA HOLIDAY PARKS UPDATE

            That Council note the report by the Commercial Business Advisor to the Services
            & Organisation Committee Meeting dated 12 August 2025 providing an update
            on operations of the Noosa Holiday Park Business Activity to 30 June 2025.
11.2.12.    COUNCILLOR REMUNERATION UPDATE

            That Council note the report by the People and Culture Manager to the Services
            and Organisation Committee dated 12 August 2025 informing Council of the
            determinations of the Queensland Local Government Remuneration
            Commission, as detailed in the Local Government Remuneration Commission
            Annual Report 2024.
11.2.13.    SERVICES & ORGANISATION COMMITTEE RECOMMENDATIONS ENBLOC

             Council Resolution
             Moved:           Cr Amelia Lorentson
             Seconded:        Cr Karen Finzel
             That the Recommendations of the Services & Organisation Committee meeting
             dated 12 August 2025 be received and adopted except where dealt with by
             separate resolution.
             Carried.
                               Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr
             For:              Amelia Lorentson, Cr Brian Stockwell, Cr Tom Wegener,
                               Cr Nicola Wilson
             Against:          None

11.3 GENERAL COMMITTEE RECOMMENDATIONS DATED 18 AUGUST 2025


11.3.14.    GO NOOSA REPORT (REFERRED FROM SERVICES & ORGANISATION
            COMMITTEE DATED 12 AUGUST 2025 - ITEM 7.1)

             Motion
             Moved:            Cr Karen Finzel
             Seconded:         Cr Tom Wegener
             That Council:
             A. Note the report by the Director Infrastructure Services to the Services &
                Organisation Committee Meeting dated 12 August 2025 regarding the Go
                Noosa Program;
             B. Delegate authority to the Chief Executive Officer to approve the ongoing
                implementation of the Go Noosa Initiatives as outlined in this report, subject
                to Council’s annual budget processes;
             C. Note the temporary repurpose of the carpark in the “Main Beach Local
                Government Reserve” (adjacent to the Noosa Heads Surf Club) as a Main
                Beach Drop-Off Zone during the peak Christmas and New Year’s Eve period
                to improve safety, traffic congestion and functionality of the space;
             D. Note the successful trial of temporary streetscape and parking improvements
                on Hastings Street and Noosa Drive during peak periods, including that staff
                will be exploring design and costs of deployable temporary "parklets" for

Page 14

ORDINARY MEETING MINUTES                                                     21 AUGUST 2025


                future peak seasons to enhance the pedestrian safety, comfort and public
                realm activation;
             E. Approve the temporary carparking at the Noosa Heads Lions Park by the
                Tewantin Noosa Lions Club for the holiday season subject to the following:
                1. Confirm use of the Noosa Heads Lions Park as a temporary carpark
                during the Christmas 2025–26 holiday period with decision on Easter
                deferred until further community consultation arising from the Destination
                Management Plan;
                2. Authorise the CEO to negotiate terms of car parking at Noosa Heads
                Lions Park with the Tewantin Noosa Lions Club to ensure Council's costs for
                oversight and damage recovery at the site are fully recovered before income
                sharing.
                3. Implementation of a formal Traffic Management Plan (TMP) to improve
                safety and vehicle management on the site;
             F. Support the integration of a transparent performance and reporting
                framework into the Go Noosa program, including baseline data collection and
                clear outcome targets, to ensure the program delivers quantifiable benefits
                for residents, visitors, and local businesses.
             G. As part of the 2026/27 Budget process investigate the inclusion of other high-
                demand areas such as Peregian Beach and Cooroy, with a view to improving
                traffic flow, enhancing pedestrian safety, and supporting a positive visitor and
                community experience.



             Amendment
             Moved:            Cr Amelia Lorentson
             Seconded:         Cr Jessica Phillips
            Amend Item G to read as follows:
            G. As part of the 2026/27 Budget process investigate the costs, resourcing and
            feasibility for the inclusion of other high-demand areas such as Peregian Beach
            and Cooroy, with a view to improving traffic flow, enhancing pedestrian safety, and
            supporting a positive visitor and community experience and investigate a broader
            range of sustainable transport initiatives, including enhancements to Noosa’s river
            transport network, boating facilities and associated land-based infrastructure, to
            better serve local residents and reduce reliance on private vehicles.
            Carried.
                                 Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr
            For:                 Amelia Lorentson, Cr Brian Stockwell, Cr Tom Wegener,
                                 Cr Nicola Wilson
            Against:             None


             Council Resolution
             Moved:            Cr Karen Finzel
             Seconded:         Cr Tom Wegener
             That Council:
             A. Note the report by the Director Infrastructure Services to the Services &
                Organisation Committee Meeting dated 12 August 2025 regarding the Go
                Noosa Program;
             B. Delegate authority to the Chief Executive Officer to approve the ongoing
                implementation of the Go Noosa Initiatives as outlined in this report, subject
                to Council’s annual budget processes;

Page 15

ORDINARY MEETING MINUTES                                                     21 AUGUST 2025


             C. Note the temporary repurpose of the carpark in the “Main Beach Local
                Government Reserve” (adjacent to the Noosa Heads Surf Club) as a Main
                Beach Drop-Off Zone during the peak Christmas and New Year’s Eve period
                to improve safety, traffic congestion and functionality of the space;
             D. Note the successful trial of temporary streetscape and parking improvements
                on Hastings Street and Noosa Drive during peak periods, including that staff
                will be exploring design and costs of deployable temporary "parklets" for future
                peak seasons to enhance the pedestrian safety, comfort and public realm
                activation;
             E. Approve the temporary carparking at the Noosa Heads Lions Park by the
                Tewantin Noosa Lions Club for the holiday season subject to the following:
                1. Confirm use of the Noosa Heads Lions Park as a temporary carpark during
                the Christmas 2025–26 holiday period with decision on Easter deferred until
                further community consultation arising from the Destination Management
                Plan;
                2. Authorise the CEO to negotiate terms of car parking at Noosa Heads Lions
                Park with the Tewantin Noosa Lions Club to ensure Council's costs for
                oversight and damage recovery at the site are fully recovered before income
                sharing.
                3. Implementation of a formal Traffic Management Plan (TMP) to improve
                safety and vehicle management on the site;
             F. Support the integration of a transparent performance and reporting framework
                into the Go Noosa program, including baseline data collection and clear
                outcome targets, to ensure the program delivers quantifiable benefits for
                residents, visitors, and local businesses.
             G. As part of the 2026/27 Budget process investigate the costs, resourcing and
                feasibility for the inclusion of other high-demand areas such as Peregian
                Beach and Cooroy, with a view to improving traffic flow, enhancing pedestrian
                safety, and supporting a positive visitor and community experience and
                investigate a broader range of sustainable transport initiatives, including
                enhancements to Noosa’s river transport network, boating facilities and
                associated land-based infrastructure, to better serve local residents and
                reduce reliance on private vehicles.

             Carried.
                               Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr
             For:              Amelia Lorentson, Cr Brian Stockwell, Cr Tom Wegener,
                               Cr Nicola Wilson
             Against:          None

11.3.15.    FINANCIAL PERFORMANCE REPORT – JULY 2025

            That Council note the report by the Acting Financial Services Manager to the
            General Committee Meeting dated 18 August 2025 outlining the July 2025 year
            to date financial performance against budget.
11.3.16.    BUDGET REVIEW 1 (BR1) FOR THE 2025/26 FINANCIAL YEAR

            That Council note the report by the Acting Financial Services Manager to the
            General Committee Meeting dated 18 August 2025 and approve the proposed
            changes to the 2026 Budget as outlined in the Revised Budget Financial
            Statements and Supporting Schedules provided in:
            A. Attachments 1, 3, 4, 6 & 7 to this report and
            B. Amended Attachments 2 & 5 as supplied as Attachment 1 to the Minutes -
            Revised Attachment 2 Statement of Financial Position BR1 & Attachment 2 to
            the Minutes - Revised Attachment 5 Financial Sustainability Ratios BR1.

Page 16

ORDINARY MEETING MINUTES                                                     21 AUGUST 2025


11.3.17.    OPERATIONAL PLAN 2024-25 Q4 QUARTERLY REPORTING

            That Council note the report by the Executive Officer to the General Committee
            dated 18 August 2025 regarding the 2024-25 Operational Plan and:
            A. Note the progress report for Q4 2024-25 Operational Plan to 30 June 2025
               provided as Attachment 1;
            B. Note the status of Council's Operational Key Performance Measures provided
               as Attachment 2.

11.3.18.    PLANNING &
            ENVIRONMENT COURT APPEAL NO. 3746 OF 2023 – APPLICATION FOR
            SHORT TERM ACCOMMODATION (15 ECO CABINS) AT 94 & 142 NOOSA
            DRIVE, NOOSA HEADS

            Cr Brian Stockwell
            In accordance with Chapter 5B of the Local Government Act 2009 - I inform the
            meeting that I have a prescribed conflict of interest in relation to Item 9.1 -
            PLANNING &
            ENVIRONMENT COURT APPEAL NO. 3746 of 2023 – APPLICATION FOR
            SHORT TERM ACCOMMODATION (15 ECO CABINS) AT 94 & 142 NOOSA
            DRIVE, NOOSA HEADS on this agenda because RACV is a sponsor of the Noosa
            Lions Football Club which I am currently the president of. As a result of my conflict
            of interest, I will now leave the meeting room while the matter is considered and
            voted on.

            Cr Stockwell left the room.

             Council Resolution
             Moved:           Cr Amelia Lorentson
             Seconded:        Cr Nicola Wilson
             That Council note the report by the Manager Development Assessment to the
             General Committee Meeting dated 18 August 2025 regarding Planning and
             Environment Court Appeal 3746 of 2023 and agree to settle the appeal generally
             in accordance with the proposed conditions outlined in Attachment 1.
             Carried.
                              Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr
             For:
                              Amelia Lorentson, Cr Tom Wegener, Cr Nicola Wilson
             Against:         None

            Cr Stockwell returned to the room.


11.3.19.    GENERAL COMMITTEE RECOMMENDATIONS EN BLOC

             Council Resolution
             Moved:           Cr Frank Wilkie
             Seconded:        Cr Karen Finzel
             That the Recommendations of the General Committee meeting dated 18 August
             2025 be received and adopted except where dealt with by separate resolution.
             Carried.

Page 17

ORDINARY MEETING MINUTES                                                 21 AUGUST 2025


                               Cr Frank Wilkie, Cr Karen Finzel, Cr Jessica Phillips, Cr
               For:            Amelia Lorentson, Cr Brian Stockwell, Cr Tom Wegener,
                               Cr Nicola Wilson
               Against:        None


12   ORDINARY MEETING REPORTS
     Nil.


13   CLOSED SESSION
     Nil.


14   NEXT MEETING
     The next Ordinary Meeting will be held at Council Chambers, 9 Pelican St, Tewantin
     on Thursday 18 September 2025 at 10.00am.


15   MEETING CLOSURE
     The meeting closed at 6.26pm.

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

04d38b844a.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.