Original source · versioned page text
Attachment 5A - Noosa Landfill RRA Flood Assessment
Very large file (106 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa Landfill RRA Flood Assessment
4 VALIDATION
Validation of peak flows at the proposed RRA fill site has been carried out against a Rational
Method peak flow calculation. Details of the Rational Method calculation are provided in Appendix
A. The peak flow comparison shown below demonstrates a good level of agreement between the
TUFLOW results and the Rational Method.
Table 4-1 Peak Flow Validation at Northern Boundary of the Landfill Site
Rational Method Peak Flow (1% AEP) 12.8 m3/s
TUFLOW Peak Flow (1% AEP)
(Critical Duration of 30 minutes) 14.0 m3/s
Difference + 9.4%
J00352R1V2 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.