Attachment 5A - Noosa Landfill RRA Flood Assessment
Very large file (106 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Noosa Landfill RRA Flood Assessment 5 PROPOSED CASE MODELLING The proposed RRA fill pad has been incorporated into the model using TUFLOW z-point modifiers. The site fill area has been raised to above the DFE flood level and graded to fall northwards. Details of the proposed case model topography are shown on image 5-1. Image 5-1 Proposed Case Model Topography The proposed case ground level assumptions modelled are appropriate for an initial constraints assessment but will need to be refined as part of future detail design. Finished floor levels of any buildings constructed on the fill pad will need to achieve the minimum levels shown on Image 5-2. This will ensure finished floor levels are a minimum of 300mm above the DFE peak flood levels. J00352R1V2 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.