Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

Response to Information Request 10-6-2025 Traffic management plan · OPW25/0042

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Traffic Management Plan – 25040286

   7. SAFETY PLAN
   7.1 Occupational Safety and Health

All persons and organisations undertaking these works or using the roadwork site have a duty of care under
statute and common law to themselves, their employees and all site users, lawfully using the site, to take all
reasonable measures to prevent accident or injury.

This TMP forms part of the overall project Safety Management Plan and provides details on how all road users
considered likely to pass through, past, or around the worksite will be safely and efficiently managed for the full
duration of the site occupancy and works.

   7.2 Roles and Responsibilities

   7.2.1   Responsibilities

The Project Manager has the ultimate responsibility to ensure the TMP is implemented for the prevention of
injury and property damage to employees, contractors, sub-contractors, road users and all members of the
public.

The Project manager will ensure all site personnel are fully aware of their responsibilities, and that Traffic
Controllers are appropriately trained and accredited and that sufficient controllers are available to ensure
appropriate breaks are taken.

All personnel engaged in the field activities will follow the correct work practices as required by the CoP,
AGTTM and AS1742.3.

All personnel will not commence or continue work until all signs, devices and barricades are in place and
operational in accordance with the requirements of the TMP.

All personnel responsible for temporary traffic management shall ensure that the number, type and location of
signs, devices and barricades are to a standard not less than Appendix F of this plan, CoP, AGTTM and
AS1742.3 (except where specifically detailed in this TMP with reasons for the variations). Should a situation
arise that is not covered by this TMP, CoP, AGTTM or AS1742.3, the Road Authority Representative shall be
notified.




               Document MSF-AT-TMP-001| Issued 05 September 2024| Review: 05 September 2025| Owner: Trevor Leggett | Page: 30
                                      [UNCONTROLLED IF WHEN PRINTED AFTER 05 September 2024]

Used in these records

About this file

File size
1.3 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Response to Information Request 10-6-2025 Traffic management plan.pdf · 1.3 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.