GENERAL COMMITTEE MEETING 17 JUNE 2019
Condition 23 is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
24. The road verge along the frontage of the site to Opal Street must be upgraded in
accordance with an Operational Works approval and must include in particular:
a new 2.0m wide concrete pathway with adjusted alignment and
construction methods as necessary to protect the survival of existing street
trees
construction of car and scooter parking in accordance with the
Infrastructure Agreement
Reinstatement and landscaping
Condition 24 is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
Pedestrian and Bicycle Facilities
25. The pedestrian link between Diamond Lane and Opal Street must remain
available to pedestrians during business hours.
25.26. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
Internal pedestrian footpaths in accordance with the approved plans
a total of 8 bicycle parking spaces
end of trip facilities involving 4 lockers and 1 shower with ancillary change
rooms.
Public Safety
26.27. All ground floor shopfront glazing must be protected against vandalism by
the use of a form of safety glass such as toughened or laminated glass.
27.28. During operating hours, all parking areas, pedestrian areas and
entrances/exits to all stairwells, foyers and public toilets must be well lit with
vandal resistant lighting and with intensities to satisfy the requirements of
Australian Standard AS1158 “Public Lighting Code”. Lighting must be designed
to reduce the contrast between shadows and well lit areas. In particular,
appropriate security lighting must be provided in the location shown at the
corridor servicing the toilets and change room.
Electricity and Telecommunication Services
28.29. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
29.30. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Page 5 of 13