GENERAL COMMITTEE MEETING 17 JUNE 2019
Easements
30.31. Unless otherwise agreed in writing by the relevant service provider, any
public or third party infrastructure located on the subject site must be placed
within an easement registered against the title of the property.
31.32. All easements must be designed in accordance with the planning scheme
and granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
32.33. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
33.34. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
34.35. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in height
must be fitted with a commercial grade safety fence.
Damage to Services and Assets
35.36. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing services
and assets must first be referred to the relevant service authority for approval.
Landscaping Works
36.37. The development site must be landscaped prior to the commencement of
use. The works must be undertaken in accordance with an Operational Works
approval and the Noosa Plan for that specific area and must include in particular:
a. The landscape areas generally shown on the approved Site Plan/Ground
Floor Plan Rev. A prepared by Andrew McKellar Design dated April 2019
with the following amendments:
i. A minimum 2.0 metre-wide landscaping strip, within the lot, to the
Diamond Lane frontage adjacent to the full length of the building and
outside the area to be dedicated as lane. This landscaping must
comprise a mix of ground covers, shrubs and small trees
ii. The provision of island landscaping within the Opal Street road
reserve in the currently paved area between the scooter spaces and
the car parking spaces. The landscaping is to include a small tree.
Page 6 of 13