Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-06-17 General Committee Meeting Notes

of 13

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING                                                          17 JUNE 2019


         44.45.   Service vehicle parking, manoeuvring and standing space along Diamond
              Lane must be provided in accordance with the approved plans. The works must
              be undertaken in accordance with an Operational Works approval.
         RECONFIGURING A LOT
               When Conditions Must Be Complied With
         45.46.    Unless otherwise stated, all works required by the conditions of this Decision
              Notice must be completed prior to submission of the subdivision plan to Council
              for compliance assessment.
               Approved Plans
         46.47.    Development undertaken in accordance with this approval must generally
              comply with the approved plans of development. The approved plans are listed
              in the following table unless otherwise amended by these conditions.

                Plan No.             Rev.    Plan/Document Name                   Date

                DA-16.0518.2A        A       Site plan/Ground floor plan          April 2019

         47.48.  All lot numbering on the subdivision plan to be submitted to Council for
              compliance assessment must remain as shown on the Approved Plans.
         Dedication
         48.49.   The submitted Plan of Survey shall include a two (2.0) metre wide strip
              extending across the full length of the frontage to Diamond Lane is to be
              dedicated to Council as ‘Road’.
         Water & Sewer Connections
         49.50.    An underground connection to reticulated water and sewerage must be
              provided to each lot in accordance with the standards and requirements of
              Northern SEQ Distributor–Retailer Authority (Unitywater).
               A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
               (Unitywater) must be submitted to Council that certifies an underground
               connection to reticulated water and sewerage has been provided to each lot.
         Community Management Statement
         50.51.   Any proposed Community Management Statement required for the
              development pursuant to the Body Corporate and Community Management Act
              1997 must be submitted to Council for endorsement at the same time as
              submission of the subdivision plan to Council for compliance assessment.
         51.52.    All clauses and by-laws of the proposed Community Management
              Statement must accord with the requirements of this Decision Notice.
    B.   Enter into an Infrastructure Agreement with the applicant that provides for the
         dedication of part of the site for future widening of Diamond Lane, constructed car
         parking within the road reserve and contributions in lieu of 3 on-site car parking spaces.




                                                                                     Page 8 of 13
Log in to download the original file

2019-06-17 General Committee Meeting Notes(PDF, 620KB).pdf · 635 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.