Original source · versioned page text
2019-06-17 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 17 JUNE 2019
iii. All trees to be a minimum pot size of 100 litres and consist of local
native tree species.
iv. Views of the tree planted on site at the corner of Opal and Elm Streets
must not be impeded by the proposed feature wall, the feature wall
must have a maximum height of 1200mm from natural ground level.
b. The retention of the three street trees to the western end of the Opal Street
frontage.
c. Sub-terrain tree planting area demonstrating at least 4m³ area of structured
soils per tree is available for root growth and is not subject to compaction.
d. Details and depths of all landscaping soils, especially where subject to
compaction relating to filling of the site.
e. Details of any signage proposed to be located within areas identified for
landscaping.
37.38. All landscape works must be established and maintained in accordance with
the approved design for the life of the development, and in a manner that ensures
healthy, sustained and vigorous plant growth. All plant material must be allowed
to grow to full form and be refurbished when its life expectancy is reached.
Stormwater Drainage
38.39. The site must be provided with a stormwater drainage system connecting to
a lawful point of discharge. The works must be undertaken in accordance with
an Operational Works approval.
39.40. The plans submitted for the Operational Works approval must be prepared
and certified by suitably qualified RPEQ and include calculations in accordance
with Queensland Urban Drainage Manual and must confirm that that not increase
in stormwater runoff for all storm events up and including 1% AEP.
40.41. Stormwater runoff from the development must be disposed of on-site without
causing scour, damage or ponding on the subject site or any adjoining property.
Waste Disposal
41.42. The developer must provide waste storage and disposal facilities in
accordance with Planning Scheme Policy No. 9 “Waste Management Multi-
Dwellings and Commercial and Industrial Premises”. The facilities must include
an impervious area, within the site, correctly sized for all refuse and recycling
containers and suitably screened from public places and neighbouring
properties. A bin wash area is required with a cold-water tap, hose and drain
outlet connected to sewer, via a bucket trap. The drain outlet must be designed
to prevent storm water entry to the sewerage system.
42.43. Refuse containers must be provided in accordance with the requirements of
the Environmental Protection (Interim Waste) Regulation 1996 and (Waste
Management) Regulation 2000, for the storage and collection of refuse.
43.44. Public bins must be provided throughout the car park to reduce littering. Bins
provided must be for refuse and recycling and be decanted into the bulk bins by
the site operators.
Page 7 of 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.