Att 9 - Geotech and PASS report

Attached to the e-mail Council Road Upgrade, Attachments inc Waste Mgmt Plan & Geotech (Email 2 of 3).MCU17/0054.

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Table of Contents

                                                                                                                                                 Page

1.     Introduction..................................................................................................................................... 1

2.     Site Description .............................................................................................................................. 2

3.     Regional Geology........................................................................................................................... 2

4.     Field Work Methods ....................................................................................................................... 2

5.     Field Work Results ......................................................................................................................... 2

6.     Laboratory Testing ......................................................................................................................... 3
       6.1      Plasticity and Particle Size Distribution Testing ...................................................................3
       6.2      Compaction and Soaked CBR Testing ................................................................................4
       6.3      Acid Sulfate Soils .................................................................................................................4

7.     Proposed Development.................................................................................................................. 4

8.     Comments ...................................................................................................................................... 5
       8.1      Site Preparation and Earthworks .........................................................................................5
       8.2      Excavation ...........................................................................................................................6
       8.3      Batter Slopes .......................................................................................................................6
       8.4      Site Classification .................................................................................................................7
       8.5      Site Settlements ...................................................................................................................7
       8.6      Foundations .........................................................................................................................8
       8.7      Retaining Walls ....................................................................................................................9
       8.8      Pavement and Slab-On-Ground ........................................................................................10
       8.9      Acid Sulfate Soils ...............................................................................................................11
                8.9.1 What are Acid Sulfate Soils ..................................................................................11
                8.9.2 Criteria for Evaluation of ASS ...............................................................................11

9.     References ................................................................................................................................... 12

10.    Limitations .................................................................................................................................... 13


Appendix A:                About this Report

Appendix B:                Drawing 1 – Test Location Plan
Appendix C:                Sampling Methods
                           Soil Descriptions
                           Symbols & Abbreviations
                           Borehole Logs
Appendix D:                Laboratory Test Results




Geotechnical Investigation, Proposed Commercial Development                                                                    90151.00.R.001.docx
11-19 Hilton Terrace, Tewantin                                                                                                           May 2017
Log in to download the original file

Att 9 - Geotech and PASS report.pdf · 2.5 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.