Decision Notice - 010.2008.00001867.001 [As Published] · 132008.1867

of 14

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                      2008/1867



20.   The carpark and driveway area must have a minimum head clearance (headroom) of 2.2m at
      any point.
Frontage Works
21.   Footpath improvements such as topsoiling, grassing, and tree planting are required to the
      Elanda Street frontage of the site in accordance with Planning Scheme Policy PSP03
      Landscaping Plants & Guidelines. Grass shall be couch, free of weeds.
22.   A new 1.5m wide concrete path shall be constructed along the Elanda Street frontage of the
      site in accordance with Council’s design standards and to an alignment that protects any
      significant vegetation or any underground services. The footpath shall connect to and match
      evenly with the existing footpath networks located to the north and south of the site.
23.   All paths, driveways and parking areas shall be designed and constructed to ensure
      pedestrian safety using non-slip materials, to produce an evenly graded surface finish, and to
      be in accordance with the Disability Discrimination Act 1992 and Australian Standard 1428.1
      Design for Access & Mobility.
Road Works
24.   The full length of the Elanda Street frontage of the development site shall be upgraded by
      providing kerb and channel, bitumen road widening and landscaping improvements to the
      footpath. The new kerb and channel shall be aligned so that it is located 8 metres off the
      existing kerb and channel on the western side of the road measured from the nominal face of
      the kerb,
      All associated and ancillary work including pavement correction to the existing pavement,
      drainage works, modification of the footpath, and adjustments to the existing infrastructure
      shall be undertaken to complete the roadworks widening.
      In this regard, plans detailing this work shall be prepared and submitted to Council for
      approval prior to obtaining a Development Permit for Operational Works.
Roof Water & Stormwater Drainage
25.   Roof runoff from any new building shall be directed to a rainwater storage system or tank that
      is installed to ensure water from the rainwater storage system or tank is used for external uses
      (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming
      pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps
      and toilet cisterns. All rainwater tanks are to be designed and installed in accordance with the
      Queensland Development Code (QDC) current at the time of building approval, and shall be
      part of the plumbing application for approval. The location and capacity of the tanks shall be
      clearly shown on the plans submitted for Operational Works approval and any overflow shall
      be directed to the approved stormwater discharge point.
26.   All stormwater drainage shall be collected on site and discharged so there is no net increase
      in stormwater runoff from the site. Stormwater drainage permitted to drain from the site may
      be discharged to Council’s existing drainage structures at either the grated stormwater pit at
      the south east corner of the site or to the kerb and channel in the Henderson Street road
      reserve. Stormwater drainage permitted to drain from the site must be in accordance with an
      Operational Works Approval for stormwater drainage.
      The Operational Works application for stormwater drainage must clearly demonstrate to the
      satisfaction of the CEO’s delegated officer that the stormwater structure nominated to receive
      site drainage has sufficient capacity to receive any additional flows generated from the site.
      Plans of the drainage design shall be prepared by a Registered Professional Civil Engineer of
      Queensland (RPEQ) and submitted to Council prior to obtaining a Development Permit for
      Operational Works.
      The maximum discharge of stormwater drainage allowable to Council’s kerb & channel street
      drainage system at any one location is 25 litres/second.
                                                                                    Page 4 of 14

Used in these records

About this file

File size
83 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00001867.001 [As Published].pdf · 83 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.