                                                                                        2008/1867



      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
27.   As the site is proposed to be filled, stormwater drainage pipes and/or an overland flow-path
      that caters for drainage from the adjoining sites for a design storm with an Average
      Recurrence Interval of 1 in 100 years shall be installed within the site to collect and discharge
      stormwater runoff from all adjoining properties to prevent additional ponding/flooding on these
      properties.
28.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
29.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
30.   The existing sewer main that traverses the rear of the site and the ‘zone of influence’ (taken as
      the area within a 45-degree angle measured from the invert of the sewer main to the finished
      surface level) shall be accurately located and determined by a licensed Surveyor and shown
      on all plans submitted for Operational Works approval.
      To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
      risk of damage no structures requiring a building permit (eg. buildings, swimming pools,
      retaining walls exceeding 1m in height, raised terraces, etc) shall be constructed within this
      ‘zone of influence’ or within 1.5m of the centreline of the sewer main, whichever is the greater.
      As such the applicant shall amend Operational Works plans including Building plans to ensure
      compliance.
Town Water Supply
31.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
32.   The development shall be served by individual water meters to each tenement and be capable
      of being separately rated.
33.   Each individual water connection to the water reticulation system shall extend to the property
      boundary and be metered. All fees for the supply of water meters shall be paid to the Council.
34.   All water meters must be located outside the property boundary and in an easily assessable
      location to facilitate unhindered reading by Council and/or Council’s contracted water meter
      readers, and not behind fences or locked gates. In this regard approval of the water meter
      configuration and location must be obtained from Council’s Water & Sewerage Capital Works
      Manager prior to lodgement and approval of hydraulic drawings.
Service Easements (Sewer)
35.   A registered easement shall be created over the zone of influence of all sewers within the
      subject site and over those parts of the subject site that are impacted upon by sewers on any
      adjoining sites. The easements shall generally be parallel to and centred over the sewer main
      and be equivalent in width to twice the depth to invert level of the sewer at the deepest point
      within the allotment (measured from the finished surface) and be no less than 3.0m wide
      overall. In this regard a licensed surveyor shall accurately locate all sewer mains and
      determine the necessary width of the easement, which shall be shown on any plans submitted
      for Operational Works approval. To this extent the surveyor shall certify that the sewer and the
      zone of influence is wholly contained within the easement to be created.
      In addition to this the Applicant’s Solicitor shall give Council’s Solicitor an appropriate
      undertaking in writing that the Title Deed and the easement documents will be lodged at the
      Land Titles Office and any additional Titles Office forms or requisitions requiring the consent of
      Council will be attended to promptly.


                                                                                      Page 5 of 14

Used in these records

About this file

File size
83 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00001867.001 [As Published].pdf · 83 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.