08/0745 - Operational Works - Landscaping [As Published] · 142008.745
.
INTEGRATED PLANNING ACT 1997
SECTION 4 - Section 4 must be completed whe
IDAS Assessment Checkfist, Version 21.1, 3 March 2068
n the application seeks approval to cary out operational work.
PLANNING SCHEME _ : . ;
41 Is any of the proposed operatignél work assessable under a planning scheme?
CI No - Gotoa42 eS - (Complete Form 1, Part E} Answer Qs4.1.1 - 4.1.7 below.
STATE-CONTROLLED ROAD : . Oo
414 isanyest of the premises located in part of a future State-controlled road, or within 100m of a State-controlied road?
lo
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?
CINo 1 Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
1 Yes .
If yes, is all of the proposed operational work associated with the following?
(i) A material change of use that is assessable under the planning scheme LiNo (J Yes
(i) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots [No [] Yes
abutting the State-controlled road
|fno to either or both (i) or (i) above - Answer (a) - (c) below
(a) Is any of the proposed operational work associated with access to a State-controlled road?
O No oO YeS - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
{b) Is any of the proposed operational work for filling or excavation?
No ~§= Yes :
Ifyes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency
oO Yes - This application must be referred to DMR as Advice Agency.
(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
(No (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
Oo No - This appiication must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
(1 Yes - this application must be referred to DMR as Advice Agency.
IP Rogulaken, schedule 2, tebe 3 Sor 3 /P Reguiebon, scneduls 2, table 3 tem 46),
ACID SULFATE SOILS
4.1.2 |Is any of the operational work proposed in a local government area fisted*? in State Planning Policy 2/02: Planning and Managing
Deyefopment Involving Acid Sulfate Soils?
No-Gotoa413 []Yes
If yes, is the natural ground level of any point where work is being carried out less than 20m AHD?
[No Yes
If yes, does the proposed operational work involve the following?
(i) Excavating more than 1,000m? of soil or sediment at or below 5m AHD LINo (Yes
(ii) Filling the premises with 1,000m? or more of material with an average depth of 0.5m on CINo [Yes
land, soil or sediment at or below 5m AHD
If yes to either or both (i) or (ii) above - Tis application must to be referred to the Department of Natural Resources and Water (NRW) as
Advice Agency
iis 2 tan
Stats Prameng Patey 722. Planang and Manaong Sevsicoment availing And Suitsi
iS, Sect 26
‘1 Aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Buell, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast , Hervey Bay, Hinchinbrook, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday
“Page 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0745 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.