Council archive · source document
08/0745 - Operational Works - Landscaping [As Published] · 142008.745
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
EASEMENTS AND SUBSTATIONS
4.1.3 | ls anyof the proposed operational work for filling or excavation?
{ ho - Goadi4 []Yes
If yes, is the filling or excavation associated with reconfiguring alot?
CJ Yes {J No — Answer both (a) and (b) below ‘
{a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994?
LINo OD Yes
Hf yes, is any of the operational work proposed to be located in any part of the easement?
oO No a] Yes - This application must be referred to the entity as Advice Agency.
(b) Is any of the operational work proposed to be located within 10m of a substation site under the Efectricity Act 1994?
No ol Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
IP Ragifien sched. 2, table Jem t0ta). IP Regulation, schedule 2 ledie 3, teri 1070). -
4.14. d's part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No-Gotoas15 [JYes |
if yes, is any of the proposed operational.work for fi ing. excavation, compaction, drilling, boring or piping, not associated with
reconfiguring a lot?
CINo 01 Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
[No C1 Yes - mis application must be referred to the licence holder as Advice Agency.
JP Regulation, scheauls 2, tabi: 3 aon 17
PUBLIC PASSENGER TRANSPORT
415 sap the proposed operational work listed in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
P
jed threshold?
No - Goto 04.1.6 O Yes - - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
JP Reguisiion, cohoniute 2, table 2, der: vr
RAILWAY SAFETY AND EFFICIENCY . :
4.16 eg the proposed operational work fisted in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
{i
fied threshold?
No - Go10 04.1.7 oO Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
iP Regulation, schedtie 2 fais 3, fom 18,
KOALA CONSERVATION
4.1.7 | Js gny part of the premises in a koala conservation area or koala sustainability area?
No - Goto. Q4.2 O Yes
If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation (ie. did you answer yes’ to all questions in either Q2.1.8 or Q 3.12)?
CO Yes - Goto 04.2 (No
If no, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
(C1 Yes-Gotoas2 [No
If no, will the activity result in the following? ~ oe eee
()__ Clearing of native vegetation over an area 2a greater t than 2 2,500m?
Li) Extracting 9 gravel, rock or s
‘(ii) Excavating or filling an are eag
If yes to one or more of (i) - (Iii) above - This appication must be referred fo the Environmental Protection Agency (EPA) as
‘ Concurrence Agency.
IP Requishon scheckie 2 tbh; 2 dem 1%
WILD RIVER AREA - Although tegistation provides for assessment of operational works for residential, commercial and industrial development for the purposes of the
Wild Rivers Act 2005, currently no dectarations for any of the wild river areas apply the Wild Rivers code to that type of development,
Page 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0745 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.