INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued) “

 

46

ls any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water tuck to pump water)?
No-Gotoa47  ([] Yes - Answer (a) and (b) below
{a) Are the operations mentioned as assessable development in tha following?
(i) Awater resource plan under the Water Act 2000 CINo 0 Yes

{ii) A regulation under the IPA or the Water Act 2000 Ono. [Yes

If yes to either or both of (i) or (ii) above - (Complate Form 1, Pert Ks), This application requires assessment by the Department of Natural
Resources and Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

(b) ts any of the proposed operational work mentioned as assessable in a wild river declaration and to be carried out in a wild
river area declared under the Wild Rivers Act 2005?

oO No oO Yes - tf any part of the proposal relates fo operational work in 2 high preservation area other than works stated in a wild river
declaration for the ares to be assessable development for which a development epplication may be made, the application will
be laken to be not properly made and the Assessment Manager must refuse to receive it, All other proposals are subject to the
declaration for the relevant wild river area, and assessment may be required for the purposes of the Wild Rivers Act 2005,
(Complete Form 1, Part Keif an application is made.)

tant B. IP Regudation, schodula |, part 3, lable 4, dam 3, Wate Aci 2000 section U66A (iid cer area), Wid

  
  

196 8, par I. tabbed inom Ze}, IP Re
O05 secinn 434: relevent wid fiver declaration: Wid Reers Code.

  

 

47

Is ang of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
No-Gotoass = [J Yes
{f yes, are the operations mentioned as assessable development in the following?
(i) Awater resource plan under the Water Act 2000 Ono (Yes

(i) A regulation under the IPA or the Water Act 2000 CINo CO Yes
if yes to either or both of (i) or (li) above - (Complete Farm 1, Part Ki) This application requires assessment by the Department of Natural

Resources and Water (NRW). IFNRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.

 

FPA soba pad 1 labs 4. dear Qcni FF Regulation schedkta 2. table 2 tan & 2? Regnéation, conscie 1, pat 3 lath 4. dem <5 Wales Act 200K), section S64 (wkd sier area Note: no curent wid
rent dodig et on einities 1aking oF inkerfosing wilt subattason water 38 assusabie} Wak! Raver onde (hole the cade kes nol curranily contain eppicable provivore for subartesen watt]

 

48

 

 

 

Doeg/any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for iriterfering
with overtand flow water (other than using a water truck to pump water)?
No ~ Goo 04.9 [1 Yes - Answer both (a) and (b) delow

(a) Is the proposed operational work to be carried out in a floodplain management area of a wild river area declared under the
Wild Rivers Act 2005?
C1 Yes
lf yes, indicate what the proposed operational work relates to
() Specified works for the area [LINo OU Yes
(ii) Work state in the relevant wild river declaration to be CINo Dyes
assessable development for which an application may
be-lodged
If yes to either or both of (i) or (ii) above - (Complete Form 1, Part Kio. Subject fo the declaration for the relevant wild river area, assessment
may be required for the purposes of the Wild Rivers Act 2005)
If no to both (i) and (ii) above — the application will be taken fo be not properly made and the Assessment Manager musi refuse to receive it.

CINo
If no, are the operations mentioned as assessable development in the following?
(iii) A water resource plan under the Water Act 2000 DINo (Yes
(iv) A regulation under the IPA or the Water Act 2000 No (1 Yes

{f yes to either or both of (i) or (if) above - (Complete Form 4, Part Kio) This application requires assessment by the Department of Natural
Resources and Water (NRW). if NRW is nof the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

(b) _{s the interfering with overland flow water proposed in an area declared under the Water Act 2000 to be a drainage and

embankment area (other than a wild river floodplain management area) and declared to be assessable under that Act?

oO No oO Yes - (Complete Form 1, Part Kr) This application requires assessment by the Department of Natural Resources and Water
(NRW), If NRW is nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

$52 Rog@alios, scheduie %, pint 3 lable 4, dem 2A, Water Act 060, section

 

OS (wed thet ar2a),

 

 

Page 26

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0745 - Operational Works - Landscaping [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.