Skip to the record
The gold standard in government transparency.

Council archive · source document

08/0745 - Operational Works - Landscaping [As Published] · 142008.745

of 26

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

 

TAKING OR INTERFERING WITH WATER; WILD RIVER AREA (continued)

4.9 _ |Is the proposed operational work for the following?

{i) For the construction of a referable dam as defined under the Water Act 2000 (CINo (Yes

(li) To increase the storage capacity of a referable dam by more than 10% DCONo [D)Yes

If yes to either or both of (i) or (i) above - (Complete Form 1, Part Ks) This application requires assessment by the Department of Natural Resources and
Water (NRW), if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

|_| IPA, schodute 6, part 7. tate 4, dem 4: iP Reputation, schedite 2 tabla 2 dem id.

TIDAL WORK; WILD RIVER AREA

4.10 Is any oft josed operational work tidal work, other than excluded work defined under the IPA?
6 ~Gotoa4.11  (_) Yes ~ Answer (a) and (b) below

(a) _!s any of the proposed tidal work prescribed tidal work? —__
C1 Yes : :
If yes, is any of the proposed prescribed tidal work to be carried out in a wild river area declared under the Wild Rivers
Act 2005?
CNo a
)
If no, is the ‘work ‘proposed ir in a canal? :
CINo }
{f no, is any of the proposed tidal work for a marina with more than 6 vessel! berths? i

oO No - (Complete Form 1, Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensland
Transport (Maritime Safety Qid) as Concurrence Agency.

Oo Yes - (Complete Farm 1, Part P). it the Environmental Protection Agency (EPA) is not the Assessment Manager for the
application, the agency has jurisdiction as Concurrence Agency. The application also requires assessment by Queensiand
Transport (Maritime Safety Qld) as Concurrence Agency and Qld Fire and Rescue Service as Advice Agency, :

i
}
t
Yes i
‘
j

 

 

 

 

 

if yes, is any of the proposed tidal work for a marina with more than 6 vessel berths?

0 No - (Complete Form 1, Part P). This application must be referred to Queensiand Transport (Maritime Safely Qid) as
Concurrence Agency.

oO Yes - (Complete Farm 1, Part P). This application must be referred to Queensland Transport (Maritime Safety Qid) as

a a __. Concurrence Agency and Qid Fire and Rescue Service as Advice Agency. nee

CO Yes ; . , i

If yes, is all of the proposed prescribed tidal work for specified works under the Wild Rivers Act 2005?
No - An application for the operational work will be taken to be not properly made and the Assessment Manager must
refuse to receive it.

DO Yes
Ifyes, is the work proposed in a canal?
No

If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?

O No - Uniess the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transport (Maritime Safety Qk) as Concurrence Agency
and assessment for the purposes of the Wild Rivers Act 2005.

oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) if the Environmental Protection Agency (EPA) is
nol the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. The
application also requires assessment by Queensland Transpart (Maritime Safety Qld) as Concurrence Agency
and Qid Fire and Rescue Service as Advice Agency. Subject to the deciaration for the relevant wild river area, the
application also requires assessment for the purpases of the Wild Rivers Act 2005.

0 Yes .
If yes, is any of the proposed tidal work for a marina with more than 6 vessel berths? i

O No — Uniess the application is consistent with any property development plan applying to the Jand, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P) This application must be referred to Queensland ‘
Transport (Maritime Safety Qld) as Concurrence Agency. Subject to the declaration for the retevant wild river i
area, the application also requires assessment for the purposes of the Wild Rivers Act 2005. 1

O Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it. (Complete Form 1, Part P} This application must be referred to Queensland t
Transport {Maritime Safety Qid) as Concurrence Agency and Qid Fire and Rescue Service as Advice Agency. '
__The application also requires assessment for the purposes of the Wild Rivers Act 2005,__ . t

 

 

 

(No - Goto the first question on the next page of this Cheektist ; i
Page 27

 

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0745 - Operational Works - Landscaping [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.