INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

 

REMOVAL, DESTRUCTION OR DAMAGE OFA MARINE PLANT; WILD RIVERAREA  *

 

4.14

 

Is any of, sed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
-Gooasi5 (] Yes

it yes, is the ‘proposed operational work reasonably nect necessary for: for: (Tick applicable box/es and answer (a) andlor (b) below)

 

“i The removal, destruction or damage of dead marine wood on unallocated State land, other than ina i CNo (1Yesi
wild river area, for trade or commerce

(i) The maintenance of existing structures, including, for example, the following structures, ifthe CNo (Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a i
structure of that type ~-

«  boatramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
« — existing drainage structures;
_ © existing powerlines or associated powerline infrastructure
(iii) For educational or research purposes or for the monitoring the impact of development on marine} L] No- “Aj Yes | i
plants ee
Ww) For the construction or placement of structures, including, for example, swimming enclosures, safety |] an No. “oO Yes | '
signs, aids to navigation, fences, pontoons, public boat ramps and pipelines, if - i
« The extent of the removal, destruction or damage is minor, and i
« The structures were constructed in compliance with all the requirements, under any Act, relating ‘ |
__toa structure of that type _ . |
W ) For the: construction of runnels for mosquito control, removal of Lyngbya, seed collection for site ] ODNo O Yes s|
__ rehabilitation or the collection of marine plants for fishing bait, or handicraft | |

 

 

(a} If yes to one or more of (i) - (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
(Yes - A permit for that aspect of the operational work is not required. Go 0 Q4.15  [_] No~ Goto (b)

(b) If no to alll of (i) - (Vv) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?

oO No - (Complete Form 1, Part Ox) This application requires assessment by the Department of Primiy | Industries and Fisheries (DPI&F). If DPI&F is not
the Assessment Manager for the application, the agency has Jurisdiction as Concurrence Agéncy,
CYes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

QO Y@S ~ Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part O2) This application requires assessment by the Department of Primary Industries and Fisheries
(OPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2008. If
OPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency,

CINo

If no, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or

infrastructure required to support other development for which a development permit is not required or, if a

development permit is required, the permit Is held or has been applied for?

O Yes - Uniess the application is consistent with any property develooment plan applying to the land, the Assessmant Manager must refuse fo
receive it. (Complete Form 1, Part O2) This application requires assessment by the Departatent of Primary Industries and Fisheries
(OPISF) and. subject to the declaration far the refevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
OPI&F is not the Assessment Manager for the application. the agency has jurisdiction as Concusrence Agency.

O No - Aa application for the operational work will be taken fo be nat properly made and the Assessment Manager must refuse to receive it.

2

      

3 oar 1 rubbed, st PA, schedule 3, 5

  

tabled fem 4: Fisherios Re

 

 

 

 

sereceas 1, eat 7, table

 

196-4. sechan 7808 frst rive:

 

 

Page 31

 

Used in these records

About this file

File size
1.7 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0745 - Operational Works - Landscaping [As Published].pdf · 1.7 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.