Council archive · source document
08/0745 - Operational Works - Landscaping [As Published] · 142008.745
INTEGRATED PLANNING ACT 1997
WILD RIVER AREA
IDAS Assessment Chacklist, Version 21.1, 3 March 2008
4.15
'sapfot the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No-Gotogsi6 {[_) Yes .
If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be
assessable? .
(i) Agricultural activities as defined under the Wild Rivers Act 2005
CINo OYes
{ii) Animal husbandry activities as defined under the Wild Rivers Act 2005
CINo D1 Yes
If yes to either (i) or (ji) above, is any part of the premises in the wild river high preservation area?
oO) Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive it
(No
If1no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005?
oO Yes - An application for the operational work will be taken to be nol properly made and the Assessment Manager must refuse to receive it.
. Oo No - Untess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it (Complete Form 1, Part Q if agricuiture, Complete Form 1, Part R if animal husbandry) Subject to the declaration for the
relevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). If NRW is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, scheduio . part 1, tain 4, nein 10-1 Regutlon, schedule 2 thle 2, diem 37: Wid Rivers Act 2005, sections 42, 434,
| STATE-CONJROLLED ROAD
4.16 ot part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
No~-Endofsection4 ([] Yes
IP Reguiaten, tehentise 2 wabka 2, tem 3
If yes, is the proposed operational work associated with any of the following? (Tick applicable box/es)
(i) A material change of use that is assessable under the planning scheme CNo [Yes
(ii) Reconfiguring a lot that increases the total number of lots, or increases the total number oflots []No (J Yes:
abutting the State-controlled road
Ifno to either or both (i) or (ji) above, and answers to questions in this section of the checklist indicate the proposed
operational work is assessable under IPA, schedule 8 - Answer (a) - (c) below,
(a) |s any of the proposed operational work associated with access to a State-controlled road?
LINo Yes - This application must be referred to the Department of Main Roads (DMR} as Concurrence Agency,
(b) Is any of the proposed operational work for filling or excavation?
CINo 0 Yes
Ifyes, is the operational work proposed in a future State-controlled road not defined by route?
oO
No - This application must be referred to the Department of Main Roads (OMR) as Concurrence Agency.
O Yes - This application must be referred to the DMR as Advice Agency.
{c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land, @
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
CINo C1 Yes
Ifyes, is the operational work proposed in’a future State-controlled road not defined by route?
O
No - This application must be referred to the Department of Main Roads {OMR) as Concurrence Agency.
(1 Yes - mis apptication must be referred fo the DMR as Advice Agency.
Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0745 - Operational Works - Landscaping [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.7 MB (small file)
- File type
No other editions are linked here.