5.3 Variations to approved plans
The Buyer must obtain the Seller’s approval to any variation to plans or specifications (other than
variations of a minor nature).
5.4 SeDer’s discretion
The Seller may at its absolute discretion permit departure from the criteria applied to this Covenant on the
merit of any application to do so, having consideration for the Design Objectives, the general amenity of
the Homesites and in particular, the impact on any neighboring properties.
5.5 Prescribed forms and application fees
Applications for approval ofplans must be lodged together with the prescribed forms and a reasonable fee
set by the Seller, the sum of which as at the date of the initial issue of this Deed shall be $200 for a typical
single lot design. The Seller shall approve complying plans and specifications within 14 days of receipt of
a conforming application.
5.6 Validity of approvals
Approvals are valid for a period of two (2)years from the date of issue by the Seller. Upon expiration of
this period, the Buyer shall re-apply to the Seller for Approval.
6. CONSTRUCTION WORKS
6.1 Time for Building Works
Building Works are to be carried out expediently, but must nonetheless be completed within eighteen (18)
months of commencement.
No improvement in the course of Building Works shall be left without progress for longer than three (3)
months without the written permission of the Seller.
6.2 Construction Hours and Site Access
Hours of construction shall be in accordance with Local Government policy and must be adhered to.
All building access for the duration of construction is restricted to the approved driveway location only,
upon which a gravel accessway shall be created in order to minimize sediment movement onto the road.
The remaining road frontage must be suitably barricaded to restrict access. Damage to the road reserve,
including the footpath, kerb, road, street landscaping and services during the course of Building Works
must be repaired by the Buyer prior to occupation.
6.3 Construction to cause minimal disturbance
In addition to all statutory requirements and conditions of Building Approval, all activity associated with
Building Works is to cause minimal disruption to the Homesites and residents within the Homesites.
The Buyer is responsible for all acts or omissions by any contractor it engages in association with the
development, construction, and upkeep of the Land. In this regard, and in addition to Local Government
conditions of Building Approval, the Buyer hereby agrees to ensure that:
(i) The Lots are to be kept in a tidy, orderly and safe condition free from rubbish and
unnecessary hazards;
(ii) All rubbish created during Building Works is to be deposited in a skip bin and must be
accessible to the builders’ sub contractors;
(iii) Adjoining allotments must not be utilised by the builder for the parking of vehicles, the
storage of building materials and/or the depositing of rubbish;
s:\documents\51958\clh_51958_021.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 Report and plans MCU12/0201Related documentApplication case desk ↗
About this file
- File size
- 19.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.