Council archive · source document
Development Application part 2 of 2 Report and plans MCU12/0201
Plans and drawings: the text below has words only, no drawings.
Very large file (19.1 MB): may take a few minutes to open.
Original PDF page 12, section 1. The text section number identifies this passage in the reader.
11
(iv) Ablution facilities complying with Local Government requirements are to be provided for
the duration of all Building Works;
(v) No dogs are brought onto the Homesites during Building Works; and
(vi) All other environmental control measures are adopted and carried out in accordance with
the Environmental Management Plan 2 that forms part of the Development Approval.
The Buyer will be invoiced for any rectification works required from breaches of these conditions.
6.4 Builders’ signs
Builders’ signage is to be restricted to one sign per Lot, for identification purposes only and shall not
exceed a gross area of 1.5 square metres without the written authority of the Seller.
6.5 Sediment and erosion control
Erosion control measures are to be established and maintained during Building Works. The Buyer is to
ensure that all contractors are referred to Environmental Management Plan 2.
7. INSPECTION OF BUILDING WORKS
7.1 Buyer to give notice upon completion
Upon the completion of Building Works the Buyer shall give notice of completion to the Seller in order
that the Seller may inspect and endorse the completed Building Works as having met the criteria assessed
and consistent with Approval.
7.2 Seller to inspect the Building Works
Within fourteen (14)days of receipt of a notice of completion, the Seller shall inspect the Building Works
and determine whether the completed work is in accordance with the Approval, and shall advise the
Buyer within three (3)working days whether the completed work is Approved Building Work. Within
seven (7)days of the inspection the Seller shall issue to the Buyer a written statement detailing any non-
compliance with this Deed.
7.3 Buyer to rectify non-compliance
Any non-compliance noted by the Seller shall be rectified within thirty (30)days of the Buyer’s receipt of
such written notice, or such longer period as may be permitted by the Seller. Upon rectification of any
non-compliance(s) the provisions of7.1 shall apply.
Should any rectification works fail to comply, the Buyer shall be granted a fmal opportunity to meet the
requirements of this Deed upon paying the Seller a fee of five hundred dollars ($500).
7.4 Seller to rectify non-compliance
If the Buyer does not comply with 7.3 the Seller may at its discretion carry out the necessary work to
remedy such non-compliance. Access for such works shall be granted forthwith by the Buyer and the cost
of such works shall be recoverable from the Buyer forthwith upon demand. Payment shall be made within
thirty (30)days of such demand. Beyond this time the Buyer shall pay to the Seller interest at the rate of
15% per annum calculated on daily rests on all costs incurred by the Seller hereunder until payment is
received in full.
7.5 Seller may authorise non-compliance
The seller may at its absolute discretion authorise non-compliance with this Deed under circumstances
where design criteria cannot reasonably be satisfied provided that the intent of the Design Objectives
pursuant to 2.2 are met.
s:\documents\51958\clh_51958_021.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application part 2 of 2 Report and plans MCU12/0201Related documentApplication case desk ↗
About this file
- File size
- 19.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.