Reference Document - Flood & Stormwater Management Plan 28_8_2025

of 56

Page text read automatically using OCR, there may be inaccuracies

                 Response:

                 Note: Afflux mapping has been updated since V1 of the report as follows:

                     •    existing scenario has been revised from E03 to E04,
                     •    proposed scenario has been revised from P04 to P06.

                 The existing scenario (E04) includes:

                     •    site survey of 25 Pavilion St, Pomona, prior to development works.
                     •    a design surface of the engineering design at 25 Pavilion St, Pomona

                 SMP-V2 has figures updated with aerial imagery that reflects the recent subdivision at 25 Pavilion Street
                 (now Majestic Drive), showing the subdivision has been considered in the existing scenario.



                 Item 16 / 17
                 16. Provide additional comment detailing that the submitted Flood Investigation has been conducted using recent
                 survey data of the completed works along 25 Pavilion Street (now Majestic Drive).

                 17. Alternatively, provide an amended Flood Investigation th10tilizesses recent survey data in conjunction with
                 Lidar to more accurately assess the impacts the proposed subdivision works will have on flood depths on external
                 sites. The amended Flood Investigation must be prepared by a suitably qualified person (RPEQ – Registered
                 Professional Engineer of Queensland).

                 Response:

                 The flood investigation has conducted using the design surface supplied by TOD consulting, which 25
                 Pavilion St has been constructed to, and is considered of sufficient accuracy for the purpose of the flood
                 investigation.



                 Items – 8 - 20
                 Provide an updated flood impact assessment and proposal plans which address the following:

                 18. Provide updated proposal plans which show drainage easement overall balance areas of Lot 9 which will
                 remain below the 1%AEP (2100) flood level

                 19. Amend the earthworks design for Lots 8 and 9 such that there is no net loss of floodplainstorage (e.g. provide
                 partial retaining)

                 20. Provide an additional flood afflux map showing the impacts associated with this development only (i.e. not
                 combined impacts with 25 Pavilion St development).

                 Response:

                 18. Figure 2-3 in the report has been added to clarify proposed cut and fill areas in relation to the 1% AEP
                 (Climate change) flood level/

                 19. Updated

                 20. Afflux map updated (E05 vs P06) – Refer SMP-V2 Appendix E.




                 23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona                                  Page 10

Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025

Log in to download the original (Reference Document - Flood & Stormwater Management Plan 28_8_2025.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.