                 Table 2-3: Comparison of WBNM and Rational Method Peak Flows – SUB3

                      Event AEP           63.20%         50%       20%         10%     5%         2%          1%        1%CC
                       Rational             0.15         0.18      0.28        0.34    0.41       0.52       0.60       0.72
                    Existing (m3/s)         0.13         0.16      0.30        0.38    0.47       0.58       0.68       0.88
                      Change (%)            -13%         -10%       7%         11%     14%        11%        13%        22%


                 2.1.3.      Developed Scenario
                 The Developed Scenario has been modelled in WBNM by adjusting the site’s fractions impervious values
                 and catchment delineation to represent the proposed development. The impervious fraction for the
                 developed portion of the SUB1 (adjoining approval) and SUB3 has increased from 11% to 50% (values
                 consistent with ‘Urban Residential – low density (Including roads)’ catchments in QUDM (2017)). The
                 developed catchment delineation is shown in Figure 2-2. SUB1 and SUB3 represents the development with
                 flows being routed through the existing detention basin (which has been increased in volume). The
                 catchment parameters are summarised in Table 2-5.




                 Figure 2-2: Developed Catchment Delineation

                 Similar to the existing scenario, the existing drainage capacity of Pavilion Street is approximately equivalent
                 to the 10% AEP storm event, with flow greater than this overtopping the verge and entering the site. To
                 account for this, the peak flow for SUB1-Ex was determined for the 10%, 5%, 2% and 1% AEP. The portion
                 of flow greater than the 10% AEP was converted into a ratio, which was then applied to the catchment area
                 as detailed below in Table 2-4 and Table 2-5. This ensured that flows from SUB1-Ex greater than the 10%
                 AEP were routed through the site.




                 23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona                              Page 21

Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025

Log in to download the original (Reference Document - Flood & Stormwater Management Plan 28_8_2025.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.