Reference Document - Flood & Stormwater Management Plan 28_8_2025

of 56

Page text read automatically using OCR, there may be inaccuracies

                 Appendix E details the afflux map which compares the existing and proposed case for the 1% (2100) AEP
                 flood levels. It is noted that based on the current development arrangement there are no increases in flood
                 levels noted either upstream or downstream as a result of the development site itself.

                 2.2.5.      Peak Flow
                 The assessment found the peak discharge at the site boundary are predicted to decrease slightly. This is
                 shown in Table 2-10 which compares the Existing and Proposed peak discharge at the site boundary. As
                 such it is considered that non-worsening is achieved, and the development does not impact peak flow rates
                 in the regional flood event.

                 Table 2-10: Existing and Proposed Peak discharge at the Site Boundary.
                           Peak Flow                   1% (2100) AEP
                     Existing – E03 (m3/s)                  304.53

                    Proposed – P08 (m3/s)                   303.96

                          Change (m3/s)                      -0.57



                 2.2.6.      Flood Storage
                 A flood storage assessment has been completed over the site to ensure there is no loss of flood plain
                 storage has resulted from the development. The assessment includes the adjacent site at 25 Pavilion St, as
                 a small amount of earthworks to extend into 25 Pavilion St is proposed to augment the capacity of the
                 detention basin. The assessment found that there was some loss of flood plain storage due to the
                 development. Therefore, a proposed (with cut) scenario is proposed to achieve the flood storage balance.

                 For the existing flood storage calculation, the existing peak 1% (2100) AEP flood surface was compared to
                 the existing model terrain (after construction of 25 Pavilion St). Similarly with the proposed flood storage
                 calculation, the proposed (no cut) peak 1% (2100) AEP flood surface was compared to the proposed model
                 terrain. The proposed (with cut) scenario incorporates an area of shallow cut to offset loss of floodplain
                 storage between the building pad fill at lot 8 and the vegetation covenant. Refer to engineering drawings
                 (Appendix A) for extent of proposed cut.

                 Details of the flood plain storage within 33 and 25 Pavilion Street, Pomona, in the existing, proposed and
                 mitigated cases are summarised below in Table 2-11. A summary of proposed cut and fill areas in relation
                 to the 1% AEP (Climate change) flood level is shown in Figure 2-3.

                 Table 2-11: 1% AEP Flood Storage Comparison.
                          Scenario                                          Flood Plain Storage (m3)
                                               25 Pavilion St          33 Pavilion St          Total    Balance
                  Existing                          7899                  10099.5            17998.5

                  Proposed (no cut)                 7890                   9960.5            17850.5      -148
                  Proposed (with                                          10108.5            17998.5        0
                                                    7890
                  cut)




                 23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona                            Page 26

Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025

Log in to download the original (Reference Document - Flood & Stormwater Management Plan 28_8_2025.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.