Reference Document - Flood & Stormwater Management Plan 28_8_2025
Figure 2-3: Proposed cut / fill areas and extent of 1% AEP (CC) flood level
2.2.7. Flood Immunity
The NSC Planning Scheme identifies the Defined Flood Event, from which freeboard is set is the 1% (2100)
AEP flood event. Flood levels around the site for the 1% (2100) AEP are detailed for various reporting
locations as shown in Figure 2-4. This shows the proposed new lots are above the 1% (2100) AEP peak flood
levels. The peak flood level, minimum finished flood level and proposed lot level is shown in Table 2-12. It
is seen that greater than 500mm freeboard is provided to lot. It is recommended that future buildings on
each lot achieve a minimum of 500mm freeboard above the regional 1% (2100) AEP flood level.
Table 2-12: Lot Levels Compared to Adjacent 1% AEP Peak Flood Levels
Lot 1% AEP Peak Flood Minimum Freeboard Min Finished Floor Proposed Min Lot
Level (m AHD) to Floor (m) Level (m AHD) Level (m AHD)
8 83.44 0.5 83.94 87.65*
*Reported level is min lot level within the proposed building footprint area
23-0167SMP01-V4 | Stormwater Management Plan | 33 Pavilion Street, Pomona Page 27
Document Set ID: 24092538
Version: 1, Version Date: 02/09/2025
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewSearchable page text hides email addresses. Original files are unchanged and may show email addresses.