Council archive · source document
OPW14/0239 - Prescribed Tidal Works Application - 7 Peza Court, Noosa Heads
Table A-operalional Work
Does the operational work involve the following? (Tick all applicable boxes.)
a) Tidal works as defined under the Coastal Protection and Management Act t995 (e.g. basins, breakwater, bridges,
boat ramps, decks and boardwalks, docks, dockyards, groynes, jetties, marinas, pipelines, pontoons, powerlines,
seawalls, slips, training walls, wharves and the reclamation of land under tidal water)?
D No [{]Yes
If yes, what is the purpose?
I PONTOON FOR PRIVATE USE I
[{] Private purpose (e.g. private pontoon)
D Another purpose (e.g. commercial marina)
Does the tidal works also require resource allocation under the Coastal Protection and Management Act 19957
[(]No DYes
If applicable what is the estimated value of the proposed works?
I I
b) Interfering with quarry material as defined under the Coastal Protection and Management Act 1995 (e.g.
excavating or moving sand, gravel or any other earth material on state coastal land such as roads, esplanades,
parks or unallocated state land) on state coastal land above high-water mark.
o No DYes
If yes, which of the following?
D Works for coastal management purpose involving beach nourishment, dune fencing, revegetation of dunal areas
with endemic native plants, or stinger net enclosures.
D For purposes directly related to the provision of lifesaving or rescue services by a volunteer community
organisation.
D For other purposes (please state below).
I I
If applicable what is the estimated value of the proposed works?
I I
c) Disposing of dredge spoil or other solid waste material in tidal water?
0 No DYes
If applicable what is the estimated value of the proposed works?
I I
d) Constructing an artificial waterway?
o No DYes
If applicable what is the length of the waterway?
I I
e) Removing or interfering with coastal dunes on land, other than state coastal land, that is in an erosion prone area
as defined in the Coastal Protection and Management Act 1995 and above high water mark (e.g. lowering dune
vegetation on freehold and leasehold land)?
o No DYes
If applicable what is the estimated value of the proposed works?
I I
IDAS form 23-Tidal works anddevelopmenr wlthm
coastal management districts
Version 3.0-1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0239 - Prescribed Tidal Works Application - 7 Peza Court, Noosa HeadsRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.