Council archive · source document
OPW14/0239 - Prescribed Tidal Works Application - 7 Peza Court, Noosa Heads
Table B-Material change of use
a) Does the material change of use involve the following? (Tick all applicable boxes.)
o Operational work carried out completely or partly in a coastal management district
b) Does the material change of use involve building work carried out completely or partly in a coastal management
district that is:
o the construction of new premises with a gross floor area of at least 1000 m'
o the enlargement of the gross floor area of existing premises by more than 1000 m'
Table C-Reconfiguring a lot
a) Does the reconfiguring a lot involve the following? (Tick all applicable boxes.)
o Land situated completely or partly in a coastal management district
o The construction of a canal
b) How many lots will be created?
I
Table D-Building work
a) Is the building work on land completely or partly seaward of the coastal building line under the Coastal Protection
and Management Act 1995?
o No o Yes
3. Is the tidal works located within a local government tidal area? (Tick all applicable boxes)
o No 0 Yes-provide details below
I Local government: I
I Mandatory supporting information
4. Please provide the following information Confirmation of Method of
lodgement lodgement
For all applications
A statement addressing the relevant part(s) of the State Development
Assessment Provisions (SOAP).
0 Confirmed
0 Not applicable
For applications involving operational work that is tidal works
A copy of the certificate of title for the land (including tidal land) that
would abut or adjoin the proposed works.
0 Confirmed
0 Not applicable
Plans showing: 0 Confirmed
• the real property description and boundaries of the land (including 0 Not applicable
tidal land) that would abut or adjoin the proposed works
• the proposed works (including existing works to be removed) in
relation to relevant tidal planes (e.g. mean high water springs)
• the slope angles of the beds and banks of the tidal area and the
finished levels of the proposed works.
For tidal work that will occupy a navigable waterway provide a water
allocation area plan providing evidence that the proposed work will not
0 Confirmed
prejudice the access rights of adjoining property owners.
0 Not applicable
IDAS form 23-Tldal works and developmenl within
coastal management districts
VerSion 3 0-1 July 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW14/0239 - Prescribed Tidal Works Application - 7 Peza Court, Noosa HeadsRelated documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.