Negotiated Decision Notice MCU23 0070
Services
39. Reticulated electricity and telecommunication services must be provided to each unit/lot in
accordance with the standards and requirements of the relevant service provider.
40. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
41. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
42. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
43. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
44. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
45. All earthworks and associated retaining structures/batters, both above and below ground
level, both temporary and permanent, must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
46. All earthworks on site must be carried out in accordance with the recommendations
contained in the Geotechnical Investigation report number J001873-001-R-Rev 1 dated
August 2023 prepared by Core Consultants.
Damage to Services and Assets
47. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval.
5. REFERENCE DOCUMENTS
Plan No. Rev. Plan/Document Name Date
J001873-001- Rev 1 Report on Geotechnical Investigation - Proposed August 2023
R Mixed-Use Development - 36-38 Duke Street,
Sunshine Beach prepared by Core Consultants
M3024E_DA1 B Site Based Stormwater Management Plan prepared 19/09/2023
_SBSMP by JFP
6. REFERRAL AGENCIES
Not applicable.
Page 6 of 8
Document Set ID: 22949303
Version: 3, Version Date: 18/04/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original