The model was calibrated using the Bureau of Meteorology (BoM) data from thr Cooroy Composite, 1973 – 1983, at a
6-minute time step. The annual rainfall for this site is listed in Table 4 below:
Table 4 - Annual Rainfall
Year 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983
Annual
Rainfall 2135.5 2796.1 1178.9 2108.7 950.2 1468.5 1023.7 1232.4 1507.3 1332 2040.8
(mm)
8.3 MUSIC Model Results
The proposed treatment train modelled with MUSIC, includes the following water quality treatment measures:
A bio-retention basin will be constructed within landscaped areas to the south-east corner of the site adjacent the
2 2
existing bushland. The bio-retention basins is to have a total area of 213m and a filter media area of 114m and is to
accept runoff for all roofs, hardstand and majority of landscaped areas prior to discharging into the existing drainage
infrastructure. The basin has been modelled with an extended detention depth of 300mm, a hydraulic conductivity of
200mm/hr and a filter media depth of 500mm.
The tabulated results are shown below:
Table 5 – Treatment Train Effectiveness
Reduction Target
Unmitigated Mitigated Compliance
Pollutant Achieved Reduction
(kg/yr) (kg/yr) (Y/N)
(%) (%)
TSS 3470 490 85.7 80 Y
TP 13.1 3.61 72.7 60 Y
TN 29.3 15.0 49.2 45 Y
GP 352 0 100 90 Y
Table 6 – Mean Annual Pollutant Loads
Pre-Development Post-Development Compliance
Pollutant
(kg/yr) (kg/yr) (Y/N)
TSS 2060 490 Y
TP 5.27 3.61 Y
TN 34.8 15.0 Y
Table 7 - Daily Pollutant Loads
WQO’s Pre-Development Post-Development Compliance
Pollutant
(mg/L) (mg/L) (mg/L) (Y/N)
TSS 6 15.7 0.973 Y
TP 0.05 0.044 0.035 Y
TN 0.5 0.299 0.178 Y
As demonstrated in Tables 5, 6 and 7, the stormwater quality management strategies proposed for this development
exceed the taget reduction rates required by the NSC and the State Planning Policy (2014).
HR DESIGN Reference No: 18-0165D Page 9 of 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.