Skip to the record
The only place to find full transcripts.

Original source · versioned page text

18-0165B Stormwater Management Report_Issue D

Attached to the e-mail Amended stormwater management report - 5, 12 & 18 Taylor Court, Cooroy (MCU18/0120 & RAL18/0013 OPW18/0197) Existing landuse parameter or MUSIC.

of 35

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

8.4 Maintenance

Access to the proposed bio-retention basin may be gained from the internal hardstand area. A recommended
maintenance schedule for water quality treatment train is outlined in Table 4 below:

                                    Table 8 - Treatment Train Maintenance Shcedule

    Device           Task           Labour              Plant             Min.            Max        Failure Mode
                                                                       Frequency       Frequency
                                                                       per Annum
Bio-retention     Inspection      Maintenance             -                12               -        Grass
   Areas                            staff (1                                                         exceeds
                                    person)                                                          300mm in
                                                                                                     height.
                    Mowing        Maintenance         Whipper               12         As required   Ponding in
                                    staff (1       snipper/Mower                                     excess of
                                    person)                                                          24hrs.
                                                                                                     Accumulation
                   Cleaning       Maintenance         Shovel &              4          As required   of sediment or
                                    staff (2           Truck                                         gross
                                   persons)                                                          pollutants

    Outlet        Inspection      Maintenance             -                4           As required   Excessive
                                    staff (1                         During rainfall                 ponding.
                                    person)                             events.                      Downstream
                                                                                                     scouring.
                 Rectification   Environmental                         As required                   Discoloured
                                  Consultant                                                         discharge.
                                                                                                     Unacceptable
                                                                                                     odurs.




9   STORMWATER MANAGEMENT DURING CONSTRUCTION

Stormwater Quantity

    •   The stormwater disposal system shall be installed as soon as is practicable to allow for good and
        safe work environment practice.

Stormwater Quality

    •   Rubbish and the suspended solids will be adequately catered for by the erosion and sediment
        control plan.
    •   Oils and greases by volume from plant and equipment will be removed by the contractor and
        disposed in a satisfactory manner as specified by the EPA.
    •   Nutrients (ie fertilises etc will only be applied at the rates as specified by the manufacturers for the
        specified use.




HR DESIGN                                        Reference No: 18-0165D                               Page 10 of 15
Log in to download the original file

18-0165B Stormwater Management Report_Issue D.pdf · 2.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.